My WebLink
|
Help
|
About
|
Sign Out
Home
07/10/89
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1989
>
07/10/89
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 8:56:26 AM
Creation date
11/14/2003 3:02:13 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
07/10/1989
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18~,' Duel, amn?p~rl o~ the p~o~¢r ~rea muoive: <br /> a. ~horemnd ~omng d~mcz~ <br /> <br /> c. ~lale or i~rmll~ d~i~na~ed ri~r land use d~stnct? <br /> 1~ pe~, identi~' waler body and applicable state classification(s), and descri~ measut~ <br /> to protect ~ater and related land resources: <br /> <br />~ No ~ Yes <br />~.~ No Yes <br /> <br />See attached. <br /> <br />19. <br /> <br />Describe any physical aheration (e .g.. dikes, excavation, ifil. stresm diversion) of any <br />drainage system, lake. stream, and/or wetland. Describe measures to minimi2e im- <br />pairmen~ of the water-rela~ed resources. Esssmate quantity of m~ler~ai IO be dredged <br />end indicate where spoils will be ~eposhe~. <br />As part of the dedication for parkland 2.6 acres, of wetland will be filled. 1.6. acres of new <br />wetland will be created with some of the soil materi~ls in the eetland crees to be filled. <br /> <br />20. <br /> <br />21. <br /> <br />a.Will the project require an appropriation al ground or surface water? If yes. explain <br /> (indicate quanHtS, and source): <br /> Ut~l~tx, construction dewaLer~ng will <br /> require a D.R.~. permit <br /> <br />b.Will 1he projec~ al/ecl groundwater levels in tony wells (on or off lhe site)? If yes. ex- <br /> plain: <br /> <br />~ No ~] Yes <br /> <br />[~ No [-'l Yes, <br /> <br />Describe the erosion and sedimentafion control measuresto be used during and after <br />construction ofthe project. <br />As part of the preliminary design for grading, an erosion and sedi~ntation plan will be prepared <br />(in accordance with the Anoka County Soil anc ~ater Conservation district requirements). Erosion <br />control barriers will be used during the earthwork oper&tions of site development to prevent <br />sedimentation into wetlands and to contain runoff within the site. At the completion of site grading <br />all areas disturbed by grading will be mulched. Steep slopes {if any) will require fiber blankets. <br /> <br />22. <br /> <br />Will lhe projec~ generate: <br />1. surface and stormwater runoff?. <br />2. sanita~, wasteudater? <br />3. industrial wastewater? <br />4. cooling water (contac[ and noncontact)? <br />]f ~es. identi~., sources, volumes, quality (if other ~han normal domestic sewage4 <br /> <br />~ No ~ Yes <br /> Ves <br />~_.1 No ~ Yes <br />Ixl No ~ <br /> <br />and xreatment methods. Give ~he basis or methodology of estimates. <br /> The development of this project will generate additional storrnwater runoff due to the development <br /> of impermeable surfaces (streets, houses, drives, etc.). The s:ormwater will be directed <br /> through swales and pipes to magnesium pond. Stormwater runoff will remain approximately the <br /> same. See exhibit V. Sanitary wasteweter is estimated as follows: 115 single family units x <br /> 3.2 PE/unit x 75 gal/PE/day = 27,600 G.P.D. All sanitary wastewater will be of domestic quality. <br /> <br />]dentifv receiving waters, including groundwater, and evaluate the impacts of 1he <br />discharges lis~ed above. If discharges to ground~.a~er are anticipaled, provide per- <br />coiafion/permeabili~y and other h~drogeolo~ica) ~esI data. if available. <br /> <br /> N/A <br /> <br />23. <br /> <br />Will the project generate (either during or after construction): <br />a. air pollution? <br />b. dust? <br />c. noise? <br />d. odors? <br />If yes, explain, including as appropriate: distances to sensitive land uses: expected lev- <br />els and duration of noise: types and quantities o! air pollutants from stacks, mobile <br />sources, and fugitive emissions (dust): odor sources: and mitigative measures for any <br />impacts. Give the basis or methodology of estimates. <br /> <br /> See attached <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.