Laserfiche WebLink
24. <br /> <br />25. <br /> <br />26. <br /> <br />27. <br /> <br />D~,~,crit~zhelyp~and amounl ofsoh~ <br /> <br />Resiffentiel refu&e ~ 2.5 lbs/day x 3.6 people x !!~ lot~ ' 2000 lb~/ton - .S2 ton~/da). <br />Retu~e to ~ disposed by local trash hauler. <br /> <br /> Will the pro,oct affect: <br /> &. fish or wildlife habitat, or move'men! of animals? D No I~ Yes <br /> b. any ~ati~ s~c~ thai are officially Jlsle~ I$ Slate ~n~re~, threile~d, or <br /> s~cml concern (animal~ and/oF planz~)? <br /> If vet, explain (idenli~' specie~ and de~cri~ impact): <br />A. W~ld~fe ~ be effecte~ ~ur~n~ construc:~o~ of the property. Once the pro~ect ~ camp,s:ed <br /> w~dl~fe habitat end an~ma~ maroon: w~ re:urn to so~ oegree. <br />~. None to the best of o~r <br /> <br /> ~o an? historical, atchaeologica) or architectural re~ource~ exis~ on or near the project <br /> site? If pe~. explain (show resources on · ~ite map end describe impact): <br /> <br />None to the best of our knowledge. <br /> <br />IA)ill the project cause Ihe impairment or destruction <br />a. designated park o7 recreation areas? <br />b. prime or unique Jarmlands? <br />c. ecologically sensitive areas? <br />d. scenic views and vistas? <br />e. other unieue resources (specihy)? <br />Il yes. explain: <br /> <br />~') No [] Yes <br /> No Yes <br />No <br />No Yes <br />No Yes <br /> <br />28. <br /> <br />For each affected road indicaae the current average daily tra~c (APT). increase in APT <br />contributed by the project and the directional distributions oi traffic. <br /> <br />This project would have a total ADT volume of 115 x B = $2D ADT. The receiving roads for this <br />traffic have existing AD?~of 1BOB West of the site at Count), Road 57 and 3554 APT. East of <br />the site at County Road No. 47. <br /> <br />9 o Are adequate utilities and public services now available to service the project? ]! not. <br /> wha! additional utilities and/or services will be required? <br /> Public utilities (Sanitary Sewer) Water Ma~n) must be extended to the site. <br /> <br />Summary of Issues <br /> <br />F~ No [-~ Yes <br /> <br />Forreoular EA~s. listtheissuesasidentiBed by'yes'answers above. Discussahernativesandmitigative measuresforthese <br />issues~Forscoping EAWs, listknownissues, ahernatives, and mitigative measuresto be addres~edin ElS. <br /> <br /> The proposed project site, because of its location, soils and zoning, is well suited for the proposed <br /> development of single family lots. Environmental impacts are well below threshold level~ and other <br /> impacts such as erosion, runoff and public utilities are mitigatable. <br /> <br /> The primary issue in this development involves filling of wetlands. As a requirement for the development <br /> of public park land and for the development of some lot~ ~ portion of wetland soils will need to be dredged <br /> and backfilled with granular material. This plan proposes to mitigate some of the ~etland filling by <br /> creatin~ new wetland are~. It is anticipated that movement of animals through the area will be affected <br /> during the construction'phase and will return to near normal as habitat is restored. <br /> <br />CERTIFICATIO)%' B'V RESPONSIBLE GOVERNMENTAL UNIT <br /> <br />I hereby certik., thai the information contained in this document is true and complete to the best of m.v knowledge and tha~ <br />copies of the completed .~t~lA~ have been made available lo ali points on the official EQB distribution list. <br /> <br />Title <br /> <br />Community Develnnmpn,* Ri~ct,nr <br /> <br /> <br />