Laserfiche WebLink
Work Plan/Scope of Services <br />PHASE I <br />Initial Work Phase/Program <br />• Review existing program/budget <br />• Update program issues with City Staff <br />• Meet and receive input from user groups <br />• Review code and city planning requirements <br />• Develop written program/design objectives incorporating input and project concerns <br />• Finalize schedule <br />Schematic Design <br />• Prepare concept plans and design alternatives <br />• Prepare rough cost analysis related to concept alternatives <br />• Review with City Staff to finalize design concepts, including reconciliation of septic <br />system design (by City Staff) with sustainability specifics and cost objectives <br />• Prepare schematic plans, elevations, and computer generated 3D diagrammatic <br />illustrations. <br />• Design and system narrative to establish approach for design development <br />• Establish preliminary cost estimates <br />• Present to City Staff and others as appropriate <br />City of Ramsey responsibility: <br />Provide geotechnical information, environmental impact information, program information and <br />availability for meetings and interaction with the design team. <br />PHASE II <br />Design Development <br />• Update design concept as approved and modified and review with City Staff <br />• Prepare design development plans with proposed structural, mechanical and electrical <br />systems illustrated in CADD form explaining design and appearance character and <br />image <br />• Prepare outline specifications of materials and systems <br />• Prepare final preliminary cost estimate <br />• Prepare annual energy consumption estimate <br />• Review with City Staff at appropriate intervals to keep abreast of project, incorporating <br />input as part of team. <br />• Present to City for approval to proceed with construction documents <br />City of Ramsey responsibility: <br />Meetings and interaction with the design team for review and approval of design concepts and <br />Council approval to proceed with construction documents. <br />