My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/1989
Ramsey
>
Public
>
Agendas
>
Council
>
1989
>
Agenda - Council - 04/25/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 4:17:32 PM
Creation date
11/21/2003 11:57:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/1989
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Description of Request - The applicant requests that the site be <br />used for an aluminum processing plant aa described in the following <br />operational plan. <br /> <br />OPERATIONAL PLAN <br /> <br />The applicant ia requesting a permit to in.tall the equipment <br />necessary to process alum, tnum. The feed stock will be brought to <br />the plant in semi-trucks and delivered to one end of the building. <br />That feed stock includes scrap from tndu~trial loca~ions, aluminum <br />pickings from landfills, and the aluminum parts from automobile <br />transmissions and engines. <br /> <br />The feed stock is then transferred to the melt furnace, which melts <br />off the aluminum separating it from other metal components. The <br />aluminum ia then poured into casting machines for manufactured parts <br />on a subcontract basis, or into thousand pound ingots. Those <br />manufactured parts and ingots are then moved to the storage area for <br />cooling. After cooling they will be shipped out of the plant in <br />semi-trucks. <br /> <br />The residue from the furnace that has not been melted off i~ then <br />run through an electro magnetic crane where the steel and iron is <br />separated. The remaining residue will then be put through a <br />separator, conveyed on an enclosed conveyer to a cement block <br />storage building approximately 10' X 20'. The remainder will be <br />shipped off site for further processing. <br /> <br />The equipment to be used in the building include~ forklifts, and a <br />melt furnace. The structure of that melt ~urnace and the air <br />emiaion control equipment iA explained in the engineer's report <br />attached to this permit request. <br /> <br />The equipment to be used outside ia the electmo-magnetic crane. <br /> <br />2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.