My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/16/2013
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2013
>
Agenda - Public Works Committee - 07/16/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:34:48 AM
Creation date
7/17/2013 1:37:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/16/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 5. 5. <br />Meeting Date: 07/16/2013 <br />By: Mark Riverblood, Engineering/Public <br />Works <br />Title: <br />Recommend Shelter and Restroom for Riverdale Park — 2013 Capital Improvement <br />Background: <br />A restroom and also shelter had been discussed for many years for Riverdale Park as a stand-alone improvements <br />as a annual Parks Capital Improvement. In 2009, the City of Ramsey applied for Federal funding for the <br />Mississippi River Trail, with these two improvements as a part of the local match. The City of Ramsey (and <br />Anoka) were awarded $440,000 for this trail project which will be let for bid in August, with construction occurring <br />thereafter. <br />In January of 2013 City Council adopted Resolution 13-01-007 warranting that the shelter and restroom would be <br />built as part of the Federal trail project approvals. <br />To progress toward the project construction and completion, Staff has assembled the quotes and costs that make up <br />the various components and tasks. The first was the selection of the hexagonal shelter identical to the one <br />previously specified by the city at Sunfish Lake Park (with cladding for the support posts). This cost was obtained <br />using the State Bid Contract. <br />The next major part of the project was to obtain quotes for the restroom. The style of construction and <br />specifications were the same as the successful building installed at Emerald Pond Park in the spring of 2008. Parks' <br />Lead -person Mike Berge organized the process and issued the summary in the text below. Staff is recommending <br />CTX in the amount of $35,320. Highlighted are areas two of the companies could not meet the City's specs - and to <br />somehow add, or purchase the same product or services that CTX provides would result in a total cost higher than <br />the one recommended. <br />"Company #1 - CXT Concrete Buildings is the same company we purchased the Emerald Pond Park restroom from. <br />All of the inside fixtures have electronic flush with stainless steel plumbing. It will have a hot water heater, <br />magnetic door locking system and more. In this quote CXT will make all final connections to utilities once the <br />building is set in place. The final connections aspect is very beneficial since the city would have to hire licensed <br />contractors for these connections. CXT has done this multiple times which will ensure us that it will get done <br />correctly and safely. <br />Amount of quote - $35, 320.00 <br />Company #2 — Huffcutt Concrete Inc is another company that provided a quote. This company's restroom is similar <br />to CXT with all its options except a couple items. First one is they do not have the option of upgrading their <br />plumbing fixtures from chrome plated to stainless steel We prefer stainless steel due to the fact that it will hold up <br />better and keep its appearance much longer than chrome plated. The other option that this companydoes't offer is <br />the final connections of utilities to the building. The city would have to hire a licensed plumber and there will be <br />additional cost to a contracted electrician to make these final connections. The cost for these contractors may be <br />unknown until they complete the job. <br />Amount of quote - $33,130.00 <br />Company #3 — NCI (Norwalk Concrete Industries) is the third company that gave us a quote for this restroom. They <br />had some of the options the other companies were offering but not all of them. NCI did not have an option for <br />electronic flush on any of the fixtures They also didn't have an option for a hot water heater or final connections to <br />utilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.