Laserfiche WebLink
Review File: <br />Diamond Graphics Site Plan Review <br />Page 2 of 2 <br />No additional loading bays are proposed. <br />Landscaping: A minimum of one (1) tree per 1,000 square feet of additional building area is required as <br />well as one (1) tree per every ten (10) new parking stalls, resulting in the need for forty (40) additional <br />trees (twenty-eight [28] for the building addition and twelve [12] for the additional parking spaces). The <br />landscape plan indicates that twenty-eight (28) new trees, along with six (6) dogwood shrubs, will be <br />installed. The following revisions to the landscape plan are needed: <br />• Inclusion of twelve (12) additional trees, with at least some of them in the islands within the <br />parking lot. <br />• Additional islands must be incorporated into the two (2) rows of proposed new parking to satisfy <br />parking lot landscaping requirements. <br />• It is strongly recommended to use a species other than Sugar Maple within the parking areas (a <br />species more tolerant of harsh, urban growing conditions). <br />• Rock mulch within the parking lot islands is not acceptable, alternatives such as sod, mulch or <br />other natural ground covers should be utilized. <br />• Each parking lot island must provide a planting/rooting area of at least 162 square_ feet; please <br />include square footage of each island on landscape plan. <br />• Revise tree planting detail to include the following: <br />o Only prune out dead or deformed branches; pruning cuts shall be made just outside the <br />branch bark collar. <br />o Planting depth shall be such that the first set of primary roots is at finished grade. <br />o Cut or fold back burlap and remove at least top 1/3 of wire basket for ball and burlap <br />root stock. <br />Lighting: Proposed lighting consists of ten new building mounted light fixtures that are to be downcast. <br />Building Elevations: The proposed elevations for the addition are intended to match the existing <br />building. The new elevations will extend the same aggregate random rib pre -cast panel system with <br />smooth accents to match the existing elevations. As the addition will contain mainly manufacturing space, <br />only services doors and an overhead door on the south elevation of the additional are proposed. The <br />existing panel system with score lines will continue on all four elevations of the addition. The score lines <br />will serve as visual breaks in the otherwise flat wall line. The addition meets architectural standards of the <br />E-1 district. <br />