My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/18/2013 - Special
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2013
>
Agenda - Planning Commission - 07/18/2013 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:18:11 AM
Creation date
7/24/2013 11:23:59 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Title
Special
Document Date
07/18/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE <br />PROJECT. TITLE <br />ESCROW # <br />DEPARTMENT: <br />CITY OF RAMSEY SITE PLAN APPLICATION <br />TECHNICAL REVIEW FILE <br />7/10/13 <br />PROJECT ADDRESS <br />DIAMOND GRAPHICS <br />113681 <br />Engineering <br />Name: Leonard Linton <br />TECHNICAL REVIEWER: Phone: 763 433-9834 <br />Email: llinton(a,ci.ramsev.mn.us <br />14350 AZURITE ST NW <br />We offer the following comments regarding your site plan application: We reviewed plans consisting of <br />sheets 1 — 4 titled "Construction Plans for Aggregate Base, Bituminous Pavement, Curb & Gutter, <br />Grading, Storm Sewer and Miscellaneous Construction for Vanguard Construction" (Civil Plans) <br />prepared by Hakanson Anderson dated June 21, 2013, revised June 27, 2013. We also reviewed plans <br />consisting of sheets Al, A2, A3, A3-C and LI titled "Proposed Addition to Diamond Graphics" <br />(Architectural Plans) prepared by Rosa Architectural Group, Inc. dated June 24, 2013. <br />Civil Plans <br />Sheet 2 — Replace Silt Fence Detail and Concrete Valley Gutter Details with City Standard Details. <br />Revise wording of Erosion Control Note 5 to indicate observations are recorded in the <br />inspection log. <br />Add note: "All disturbed areas must be restored with 4" of Premium Topsoil and Sod." <br />Sheet 4 — Consider adding manhole between CBMH 2 and CBMH 4 in order to move storm sewer line <br />away from building footing. <br />The detail sheet shows heavy duty and light duty pavement sections, the areas to receive each <br />type of pavement are not specified on the plan sheet. <br />This project will disturb more than one (1) acre. A Lower Rum River Water Management Organization <br />permit will be required. Their rules require infiltration of the first one (1) inch of runoff from all new <br />impervious surfaces. The storm sewer system may require modification in order to comply with the new <br />requirements. Please submit a copy of the storm water calculations to the City. <br />Architectural Plans <br />Sheet Al — Please label the inside radius of the bituminous drive. The minimum inside radius for fire <br />apparatus access is 30 ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.