My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 08/13/2013
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2013
>
Agenda - Council Work Session - 08/13/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:36:16 AM
Creation date
8/14/2013 2:36:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
08/13/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
necessary for Developer's performance under this Agreement. <br />(e) Oversizina Reimbursement. In the event that Developer is required to <br />construct any sanitary sewer, storm sewer, watermain improvements or trail improvements <br />that will benefit properties beyond the boundary of the Developer's plat, the City shall <br />reimburse Developer for the construction costs thereof as determined by the Developer, and <br />agreed upon by the City, through invoices of work provided. . This amount shall be paid to <br />Developer on or about thirty (30) days after the City's receipt of an invoice showing the <br />amount due is provided to the City <br />(f) The Developer shall be responsible for all standard street signs at all locations <br />required for the development. <br />(g) As -built drawings of all improvements identified in Part B shall be filed with the <br />City Engineer. Such as -built drawings shall show the date of construction and shall be <br />drawn in such a manner and on such materials to meet the standards of the City available in <br />the City engineer's office. As -built drawings must be completed and filed in the City <br />engineer's office within 365 days of the completion of such improvement. If as -built <br />drawings are not filed within the time period specified the City engineer may be authorized <br />to conduct surveys and complete the drawings and all of the costs pursuant thereto shall be <br />paid by the Developer. <br />Estimated cost of Developer's Improvements, the description and completion dates for <br />Parts B are as follows: <br />Description of Improvements <br />Estimated Date to be <br />Cost Completed <br />Part B <br />1. Sanitary sewer, watermain, streets, $ <br />storm sewer, etc. <br />2. Trails/Sidewalks $ <br />Total Estimate of Part B (Items 1-2) $ <br />Estimated Legal, Engineering & <br />Administrative, Indirect costs (10%) $ <br />Total Part B $ <br />Note: Additionally, Developer shall be responsible for all typical development fees identified <br />in the City Fee Schedule as adopted by City Code. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.