My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/11/1989
Ramsey
>
Public
>
Agendas
>
Council
>
1989
>
Agenda - Council - 07/11/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 11:43:43 AM
Creation date
11/25/2003 12:04:23 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/11/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT - JUNE 21, 1989 <br /> <br />Provide riprap to an adequate depth below the channel grade and to <br />a height above the outfall or channel bottom so as to ensure that <br />the riprap will not be undermined by scour or rendered ir~effective <br />by displacement. <br /> <br />Specify that riprap be placed over a suitably graded filter <br />material or filter fabric to ensure that soil particles do not <br />migrate through the riprap and reduce its stability. <br /> <br />Require that streambank stabilization and streambed control <br />structures by submitted for review by the Organization. The review <br />will consider the need for the work, the adequacy of design, unique <br />or special site conditions, energy dissipation, the potential for <br />adverse effects, contributing factors, preservation of natural <br />processes, and aesthetics. <br /> <br />Grit Chambers <br /> <br />Grit chambers for presettlement of stormwater mus~: <br /> <br />Be designed and sized to provide theoretical settlement of a 0.3-mm <br />grit particle in still water at 10°C (based on Stoke's Law). <br /> <br />Be designed to provide sufficient storage volume for the settled <br />particles consistent with the maintenance schedule. <br /> <br />Include a device to diffuse inflow and provide a relatively uniform <br />~istribution of flow over the cross section of the chamber. <br />Provide convenient access for equipment and maintenance personnel <br />to the chamber site and into the chamber itself. <br /> <br />Be inspected at least three times a year (spring, summer and fall) <br />to determine the volume of stored grit, and be cleaned immediately <br />whenever significant gri= has accumulated or there is a likelihood <br /> <br />2302047/LRRWMO.WP/SA>I <br /> <br />8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.