Laserfiche WebLink
I. Solid and Hazardous Waste <br /> <br />This project is a Residential Development and will not <br />generate any hazardous waste. The solid waste generated by <br />the project is estimated to be 151 tons per year. This will <br />be disposed of at the landfill or recycled. (EAW) <br /> <br />Fish and Wildlife <br /> <br />Wetland areas will be preserved to the greatest extent <br />possible. A small part of a wetland will be filled to allow <br />street access. To minimize the loss of this wetland area, <br />the developer will create additional wetlands in the park and <br />on the rear yards of adjoining lots. (Comments to EAW and <br />EAW) <br /> <br />Archeological and Historical Resources <br /> <br />The proposed project has a relatively high probability of <br />containing prehistoric archeological sites. Therefore, an <br />archeological survey will be completed. (EAW and response <br />from the Minnesota Historical Society). <br /> <br />Parks and Special Resource Areas <br /> <br />Construction of this project will not create any adverse <br />impacts on parks or special resource area. As part of the <br />project, a new park will be created in conjunction with the <br />developments of Windemere Woods and Cedar Hills. (EAW) <br /> <br />Roads and Traffic <br /> <br />The proposed development is estimated to generate <br />approximately a total of 826 to 1020 ADT. Thirty-three <br />percent of the trips are estimated to be to the west and 67% <br />are estimated to be to the south along County Road No. 116. <br />The traffic estimated to go west will utilize streets in the <br />proposed plat of Cedar Hills and outlet to Sunfish Lake <br />Bouelvard by a proposed street south of Hunter's Hill <br />development. Mn/DOT states that the impact on T.H.'s 10 and <br />47 would be only moderate. (EAW and comments from Mn/DOT) <br /> <br />Utilities <br /> <br />A new sewer line will be required to serve this and other <br />proposed developments in the area. Adequate energy resources <br />are available to construct and serve the project. Natural gas <br />to the project will be provided by North Central Public <br />Service and electricity to the project will be provided by <br />Anoka Electric Cooperative. (EAW) <br /> <br /> <br />