Laserfiche WebLink
October 17, 1989 <br /> <br />Pay Estimate No. 3 (Final) <br /> <br />Honorable Mayor & city Oouncil <br />City ofRamsey <br />15153 Nowthen Blvd. N.W. <br />Ramsey, MN 55303 <br /> <br />Improvement Project 89-2 <br />Contractor: W.B. Miller, Inc., 16765 Nutria Street, Ramsey, MN 55303 <br />Bid Amount: $47,582.50* <br />Award Date: July 12, 1989 <br />Completion Date: August 11, 1989 <br /> <br />The following work hs~ been completed cn the above referenced project by W.B. Miller, Inc. <br /> <br />SCHEEULE 1.000 - STREET ~ PROJECT 89-2 156TH AVE: & ~ ST. <br /> Used <br /> <br />Extensi~ <br /> <br />1. CummonExcavation 2000 CY 2000CT $2.75 /CY <br />2. Bituminous Material for Mixture 60 T 55.3 T $120.00/T <br />3. Bit~ Surfaci~ 975 T 1064 T $12.25/T <br />4. Bituminous Drivew~yPavement 15 SY 15 SY $10.00 /SY <br />5. Aggre~teBaseClassV 1,800 T 1700 T $5.45/T <br />6. 15" ~ 149 IF 150 LF $15.00 /LF <br />7. 15" C~PAprcns 2 EA 2EA $60.00/EA <br />8. Riprap Class III 21 CY 2 CY $30.00 /CY <br />9. Topsoil 200 CY 174 CY $7.00 /CY <br />10. Cl~ring 7T~w~ 7 ~ $50.00/T <br />~. ~n~b~ 7~ 0~w~ $50.00/T <br /> <br /> $5,500.00 <br /> $6,636.00 <br />$13,034.00 <br /> $150.00 <br /> $9,265.00 <br /> $2,250.00 <br /> $120.00 <br /> $60.00 <br /> $1,218.00 <br /> $350.o0 <br /> $o.00 <br /> <br />TOTAL SCPr~TIILE 1.000: <br />SC2{EELrLE 2.000 - PS~i~T/TE STREET (~2{P~0V]~T PRO/ECT 89-10)* <br /> Used <br /> <br />$38,583.00 <br /> <br />Extension <br /> <br />2. Bituminous Material for <br />3. Bituminous Surfacing (2341) <br />4. Acjgre~te Base Class V <br />5. Topsoil** <br /> <br />245 CY 245 CY <br />15T 12.5T <br />220 T 240 T <br />500 T 429 T <br />60 CY 60 Cf <br /> <br /> $2.75 /CY <br />$120.00 /T <br /> $~.25 /T <br /> $5.45 /T <br /> $7.00 /CY <br /> <br /> $673.75 <br />$1,500.00 <br />$2,940.00 <br />$2,338.05 <br />$420.00 <br /> <br />2.000: <br /> <br />$7,871.80 <br /> <br />TOTAL S~ 1.000: <br />TOTAL S~ 2.000: <br /> <br />$38,583.00 <br />$7,871.80 <br /> <br />TOTAL W~kRK (IX4PIEI~D TO DATE: <br /> Less Pay Estimate No. 1: <br /> Less Pay Estimate No. 2: <br /> <br />$46,454.80 <br /> $5,272.50 <br />$38,030.21 <br /> <br />WE~FINALPAYMENTOF: <br />*As per Change Or der No. 1 <br />**Field Change <br /> <br />$3,152.09 <br /> <br /> <br />