Laserfiche WebLink
Ramsey, Nowthen, St. Francis, Dak Grove, and Bethel, Minnesota <br />Feasibility Study for Shared or Cooperative Fire and Emergency Services <br />Figure 24: Bethel Fire Station <br />The Bethel Fire Station is an older, steel -frame and .. <br />metal clad building that includes two, double -depth <br />apparatus bays. A portion of the building is shared <br />with the city maintenance shops. <br />Two fire engines, a water tender, one brush/grass <br />unit, and a utility vehicle have the station filled to <br />capacity with no room for future needs and very <br />limited storage space. The station is aging. <br />There are no residential or administrative facilities <br />located in the station. <br />The station is scheduled to be renovated in July with <br />the addition of a 12 x 60 ft., double depth apparatus <br />bay, roof replacement and siding replacement. <br />Survey Components I Observations <br />Structure <br />A. Construction type Metal clad, steel frame on concrete slab <br />B. Date 1970's <br />C. Seismic protection/energy audits None <br />D. Auxiliary power No generator is on site <br />E. Condition Aging <br />F. Special considerations (ADA, mixed gender <br />Not compliant with current code requirements <br />appropriate, storage, etc.) <br />Accommodations <br />A. Exercise/workout None <br />B. Kitchen/dormitory None <br />C. Lockers/showers None <br />D. Training/meetings None. Nearby City Hall facilities are used <br />E. Washer/dryer In apparatus bays <br />Protection Systems <br />A. Sprinkler system None <br />B. Smoke detection None <br />C. Security Doors are secured with combination door locks <br />D. Apparatus exhaust system None <br />Er..erKrnry 5ernres Crnnii :ng <br />21 <br />page 31 <br />