My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/29/2013
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2013
>
Agenda - Council Work Session - 10/29/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:39:52 AM
Creation date
10/30/2013 12:19:23 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/29/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/22/2013 <br />Why Another Study on Hwy 10? <br />Study Problem Statement (continued): <br />In addition, the corridor has five signalized intersections <br />and numerous other access points (14.5 per mile) <br />contributing to the degradation of the facility. Over the <br />past 10 years, 13 people have died in crashes on the 7-mile <br />corridor. Four of these fatalities were pedestrians, <br />including three in the past 18 months. <br />F <br />Why Another Study on Hwy 10? <br />Study Problem Statement (continued): <br />Considering current overall state and federal funding <br />levels, it will be difficult to achieve the vision of a freeway <br />facility on this portion of Highway 10 within the next 20 <br />years. To reduce crashes and improve mobility issues, it is <br />reasonable and responsible to implement lower cost, <br />interim measures that incrementally improve safety and <br />operations for all users of the Highway 10 corridor. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.