Laserfiche WebLink
Mayor Strommen stated the other issue is that the budget does not fund the Street Maintenance <br />Program. <br />Councilmember Riley stated he likes the fact that the capacity rate is decreased, supports the <br />budget at that level ($7,482,513), and to find other funding source for the roads. He stated he <br />would not support the Contracted Communication Services line item of $45,000. <br />City Administrator Ulrich stated staffing cuts included reducing the Office Assistant that was <br />programmed at 40 hours per week to 20 hours per week and hiring the Patrol Officer June 1 <br />instead of January 1. He stated residents will receive a notice of the budget and a public hearing <br />will be held in December to present the budget. At that point, the levy can be decreased but it <br />cannot be increased over the levy established in September. <br />Finance Director Lund explained it is not $156,000 to be cut, but $59,430 due to reduction in <br />staff and consulting. <br />Mayor Strommen stated she still thinks there is value in the Contracted Communication Services <br />but would support additional discussion. She stated concern with delaying hiring of the Patrol <br />Officer. <br />Finance Director Lund stated it would add $27,500 to the budget if hired January 1. <br />2.03: Consideration of Long -Term Street Maintenance Program (SMP) Cost and Funding <br />Options <br />City Engineer Westby presented the Long -Term Street Maintenance Program (SMP), 2013 <br />estimated costs, and funding options as detailed in the staff report. He noted the 2009 cost <br />estimate was high because it was based on reconstruction in 40 years. <br />Councilmember LeTourneau asked if these calculations put it at a 50- or 60 -year level. <br />City Engineer Westby explained that instead of assuming a 40 -year reconstruction, staff used the <br />Pavement Surface Evaluation and Rating (PASER) and based costs on the actual condition of the <br />roadway. It assumes maintaining a 60 -year life span, which may not be feasible with some <br />existing roadways because they have not been properly maintained. <br />City Engineer Westby stated past funding methods included annual levying, purchase of general <br />obligation bonds on a project -by- project basis, MSA allotments, and special assessments. He <br />noted these funding methods have become less effective due to shrinking levies, costs for <br />bonding, and you cannot assess a property more than the benefit of the project so if challenged, it <br />can be difficult and costly to prove benefit. City Engineer Westby stated the City receives a <br />$576,844 MSA construction allocation in addition to a $443,377 maintenance allocation. He <br />explained the majority of the City's MSA fund allocations in the foreseeable future will be <br />applied towards debt from previous projects. <br />City Council Work Session / August 27, 2013 <br />Page 3 of 6 <br />