My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/13/1990
Ramsey
>
Public
>
Agendas
>
Council
>
1990
>
Agenda - Council - 02/13/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:44:24 AM
Creation date
12/2/2003 9:43:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/13/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 1, 1990 <br />Page Two <br /> <br />much as several weeks have resulted during the past year waiting for replacement parts to be <br />supplied. Maintaining a stable gas flow has been and continues to be a significant problem. <br />Even with regular monitoring and pumping, long periods of inadequate pressure or gas volume <br />have occurred. Occasionally, this is due to the accumulation of moisture in the line or a <br />vacuum problem at the well, but frequently there is no immediately identifiable cause, and after <br />purging the line for various periods of time, the gas will being to flow again by itself. Short of <br />an extensive engineering analysis, we have not always been able to determine the source of <br />the problem, but it has resulted in extended periods of downtime. Staff has recommended to <br />both Waste Management and Waltek that both the gas supply system and the generating <br />equipment be carefully evaluated as part of any long-term methane recovery program. <br /> <br />ET:db <br />Enclosures <br /> <br />co: <br /> <br />Jay McLinden <br />Tim Yantos <br />Pam McCabe <br /> <br />Elwyn Tinklenberg <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.