My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/23/1990
Ramsey
>
Public
>
Agendas
>
Council
>
1990
>
Agenda - Council - 01/23/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:43:59 AM
Creation date
12/2/2003 11:52:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/23/1990
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
from all defects which would cause any unsiehtly or unworkmanlike appearance. All <br />materials shall be suitable for the services which they are to perform and the conditions <br />and slresses to which they will be normally subjected. The vehicle snail be furnished <br />wilh all ilems of accessory equipment that is advertiseo as standard by the manufacturer <br />for the model to be turnished whether or nol specific mention is made herein. <br /> <br />The equipmen', to be furnished under these specifis, ations shall be essentially the <br />standard producl of the manufacturer. All equipment shall be of the besl cluality <br />normally used for the purpose of good commercial practice and shall be the products of <br />reputable manufacturers. The equipment shall be designed and built in str~c, accordance <br />with the applicable specificalions cooes ant regulations. Design, material, and <br />workmanship and perlormance shall equal or exceed the minimum requirements of These <br />standards and they snail incorporate the latest accepted practices and usages with respect <br />to design, malerials and construction. <br /> <br />8 ) RIGHT TO OPERATE UNSATISFACTORY EQUIPMENT <br /> <br />The owner shall have the right to operate any or all apparatus as soon and as long as it is <br />in operaling condition whelher or not such apparatus has been accepted as complete and <br />satisfaclory, except that lhis shall not be constructrued to permit operation of any <br />apparatus which may be materially damaged by such operation before any required <br />allerations, or repairs have been made by the Contractor. All repairs required by the <br />Owner shall be made by the Contractor at such time as directed by the Owner, The <br />repairs and alterations shall be made in such a manner and such a time as will cause a <br />minimum interruption in the use of the apparatus by the Owner. <br /> <br />9 ) DELIVERY <br /> <br />The Contractor shall state in his proposal the date by which the vehicle will be delivered <br />to the City. <br /> <br />GUARANTEES <br /> <br />All proposals submitted shall contain the manufacturer's guarantee as to workmanship <br />and materials and shall furthermore include complete performance guarantees. <br />Proposals shall be accompanied by the manufacturers complele specifications. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.