My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/12/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 11/12/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:40:01 AM
Creation date
11/15/2013 10:43:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/12/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction of the Stage I Improvements — Plat, the financial guarantee shall be returned to the <br />Developer if the maintenance gurantee required in Paragraph 8 has been deposited with the City. <br />The determination of completion of construction shall be made by the City Engineer. <br />6. Inspection Fees. The Secondary Developer shall be responsible for all inspection <br />costs related to the installation of Improvements; provided that no inspection costs shall be <br />charged to Secondary Developer under this Development Contract by the City for Zeolite Street <br />NW in the event that the City assumes construction responsibilities for this improvement. The <br />Secondary Developer shall make cash deposits into two separate escrow accounts at the City and <br />the City shall have the authority to draw upon these funds for the purpose of compensating for <br />inspection services. For the Required Improvements —Site Plan, the Secondary Developer shall <br />make a cash deposit prior to the issuance of any building permit in the amount of Forty -Three <br />Thousand One Hundred Fourteen and 05/100 Dollars ($43,114.05), which amount is five percent <br />(5%) of the City Engineer's estimated cost of certain Required Improvements —Site Plan. In <br />addition, for the Stage I Improvements —Plat, the Secondary Developer shall make a cash deposit <br />prior to the issuance of any building permit in the amount of Twenty -Two Thousand Eight <br />Hundred and no/100 Dollars ($22,800.00), which amount is five percent (5%) of the City <br />Engineer's estimated cost of the Stage I Improvements —Plat. Upon completion of the respective <br />Improvements to the satisfaction of the City, any surplus balance remaining in the City's escrow <br />account for inspections of such improvements shall be refunded to the Secondary Developer. <br />7. Timing of Performance. The Developer shall install all Improvements by June 1, <br />2006. The Developer may, however, request an extension of time from the City. If an extension <br />is granted, it shall be conditioned upon updating the security posted by the Secondary Developer <br />to reflect the cost increases. <br />8. Improvements Maintenance Financial Guarantee. In addition to the financial <br />guarantees required above, the Secondary Developer shall provide two separate maintenance <br />guarantees to the City for purposes of guaranteeing that the Improvements (with the exception of <br />the plantings which is guaranteed under paragraph 19) have been constructed in accordance with <br />City standards. One maintenance guarantee shall be for the Required Improvements —Site Plan <br />and the other maintenance guarantee Stage I Improvements —Plat. The maintenance guarantees <br />required by this paragraph shall be in the form of cash or a letter of credit, approved as to form <br />by the City. The maintainance guarantees shall be deposited with the City at the time of <br />completion of the last item of the Improvements and upon receipt, the City shall release all of the <br />financial guarantees held by the City for the Improvements. For the Required Improvements <br />Site Plan, the maintenance guarantee shall be Thirty -Seven Thousand Three Hundred Sixty -Four <br />and 05/100 Dollars ($37,364.05),'which amount is five percent (5%) of the City Engineer's <br />estimated cost of the Required Improvements — Site Plan. In addition, for the Stage I <br />Improvements —Plat, the maintenance guarantee shall be Twenty -Two Thousand Eight Hundred <br />and no/100 Dollars ($22,800.00), which amount is five percent (5%) of the City Engineer's <br />estimated cost of the Stage 1 Improvements —Plat. These maintenance guarantees shall be held <br />by the City for a one (1) year period from the date of their deposit. These maintenance <br />guarantees are for the purpose of ensuring that the respective Improvements have been <br />constructed in accordance with City standards and may be called upon at the City's discretion <br />during said one (1) year period if the City determines it necessary to repair and/or replace any of <br />Ramsey Town Center 3rd Addition <br />Development Contract <br />Page 6 of 17 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.