Laserfiche WebLink
street can be paved this fall. If staff needs to complete storm water modeling due to switching to HDPE pipe, paving <br />would most likely not be able to be completed this fall. However, if a small section of Vanadium Street were to <br />remain a gravel surface over the winter, Public Works does not envision this as being an issue for snow plowing. In <br />this event, the street would be paved in the spring in conjunction with another paving project in this area. <br />If Council approves the use of 48" CMP pipe, the contractor that provided the low quote of $33,655.16 has informed <br />staff that they could still likely complete the work as soon as a contract is awarded. <br />Staff also recommends approving a new inspection program whereby staff will inspect all similar culverts on a <br />regular basis to allow all future culvert replacement projects to be added to the CIP and budgeted for through annual <br />culvert replacement projects, as needed. <br />Action: <br />Motion approving a regular culvert inspection program to be implemented by staff in 2014, the results of which will <br />be added to the CIP and used to budget for annual culvert replacement projects, as needed. <br />- - AND -- <br />Motion to replace the existing 48" CMP culvert with a new 48" CMP culvert. <br />- -OR -- <br />Motion to replace the existing 48" CMP culvert with a 48" HDPE culvert. <br />- - OR -- <br />Motion to evaluate other alternatives as directed by Council. <br />Attachments <br />Figure 1 <br />Figure 2 <br />Figure 3 <br />Form Review <br />Inbox Reviewed By Date <br />Grant Riemer Grant Riemer 11/07/2013 11:50 AM <br />Kurt Ulrich Kurt Ulrich 11/07/2013 03:08 PM <br />Form Started By: Bruce Westby Started On: 10/29/2013 05:51 PM <br />Final Approval Date: 11/07/2013 <br />