Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />the moisture content of the soil is likely to be the <br />highest and sprinkling of work areas during grading <br />operations, if required. At completion of <br />construction, all disturbed areas will be <br />revege=ated and all streets and parking areas will <br />be paved. <br /> <br />Noise: During construction, the operation of large <br />construction equipment will be the only source of <br />internal noise. Once the project is completed, only <br />vehicular traffic and the operation of small-scale <br />PIVAC systems for individual homes will generate <br />noise. <br /> <br />Odors: No emissions of odor by the residential uses <br />are anticipated. <br /> <br />QUESTION 24: Solid and hazardous wastes <br /> <br />No hazardous waste will be generated by this project. <br />Solid waste generated by this development is estimated <br />at 816 pounds per day or 2.9 tons per week. (102 <br />dwelling units X 3.2 persons/unit X 2.5 <br />pounds/person/day.) <br /> <br />QUESTION 28: Road affected <br /> <br />The project will add traffic to sunfish Lake Boulevard <br />and Industry Avenue. The increase to traffic on Sunfish <br />Lake Boulevard will be 272 ADT (9! ADT north, i8! ADT <br />south). The increase to traffic on Industry Avenue will <br />be 554 ADT '(151 ADT west,'363 APT east). <br /> <br /> <br />