Laserfiche WebLink
REPORT ON STATUS OF <br />JUNIPER WOODS ADDITION DEVELOPMENT <br /> AND CONSTRUCTION <br /> By: Pete Raatikka, City Engineer <br /> <br />CASE <br /> <br />Background: <br /> <br />As a result af questions arising from the construction of the.. <br />utilities and drainage improvements for the plat of Juniper Woods, <br />I have prepared a brief history of the project and the current <br />status. Following is a list of events relating to this plat. <br /> <br />In August, 1987, the developer received preliminary sketch <br />plan approval and petitioned the City for trunk sewer and <br />water. <br /> <br />In January, 1988, City Council' accepted the feasibility study <br />and ordered a public hearing. <br /> <br />Cm <br /> <br />In February, 1988, the public hearing on trunk facilities was <br />held and the developer petitioned for lateral utilities and <br />street. Planning and zoning also approved final sketch plan <br />review. <br /> <br />On April 5, 1988, Planning and Zoning Commission conducted a <br />public hearing for the request for preliminary plat approval <br />of Juniper Woods. Planning and Zoning tabled action pending <br />ability to get municipal sewer and water. <br /> <br />ee <br /> <br />On March 28, 1989, Planning and Zoning made a recommendation <br />for approval of Juniper Woods Addition as revised on May 5, <br />1988 to consist of 73 lots contingent on area being included <br />in the MUSA boundary. At that time, ponding was .proposed on <br />Block 2 with an overflow to the Rum River. <br /> <br />On April 25, 1989, city Council approved the preliminary plat <br />for Juniper Woods contingent on the area being included in the <br />MUSA boundary. <br /> <br />In June, 1989, the city received a petition for utilities and <br />streets for Phase I of Juniper Woods and ordered preparation <br />of a feasibility study. <br /> <br />On July 13, 1989, Metropolitan Council granted a FFJSA boundary <br />expansion which included the plat of Juniper Woods. <br /> <br />On August 8, 1989, City Council received the feasibility study <br /> or u~=_=~ies and set the public hearing date. <br /> <br /> <br />