Laserfiche WebLink
mo <br /> <br />~_J[uJ_[_t~ An As-Built drawing shall be provided to the City showlng <br />the location of the conductors between the breaker cablnet and the pole <br />or poles~ these drawings shall be provided to the City by the contractor <br />prlor to the City acceptlng the street lights. <br /> <br />5. ~ All conductors, sultable for direct burial, will be type USE, <br /> copper cable wlth ground. <br /> <br />6. Grounding: <br /> <br />At the breaker cabinet and at the end of each distribution clrcult <br />there must be Installed a driven ground as requlred by National <br />Electric Code Article 1250-84. <br /> <br />Any distribution circuit over 300 feet In length must have a driven <br />ground rod at midpolnt. <br /> <br />C. Ground wlre must be Insulated wlre suitable for direct burial. <br /> <br />For 120 volt.clrcults all conductors will be brought up the pole <br />and connections will be made at the fixture. The ground wire will be <br />connected to the grounding lug If provided. If.there ls no grounding <br />lug, the fixture shall be grounded to the mast arm. <br /> <br />Be <br /> <br />Where more than one Ilght is in line, a splice will be made above <br />grade In ~he junction box. Junction box shall be placed on the pole <br />approximately 1' above ground level. Splicing shall be done In the <br />Junction box and a in-the-llne fuse shall be Installed. <br /> <br />8. Photo Control: Photo control ls to be faced as nearly north as practical. <br /> <br />9. Locks.' One-shot, loop-type locks are to be placed at each feed point by <br /> the electrical contractor. <br /> <br />10. Completion: When street lighting ls completed by the Contractor, he shall <br /> contact the Electrical Inspector for inspection (Eugene Boyle, 755-1499 <br /> ]]3e electrical contractor shall forward approved copy (blue) of electrical <br /> Inspection to the City of Anoka or NSP. The City of Anoka or NSP shall <br /> energize the lights and notify the City of addresses and date energized. <br /> Final acceptance ts not made until As-Builts and 5 blue-line copies <br /> have been submltted to the Clty Engineer by the Contractor. <br /> <br /> <br />