My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/10/1990
Ramsey
>
Public
>
Agendas
>
Council
>
1990
>
Agenda - Council - 07/10/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:58:50 AM
Creation date
12/4/2003 8:39:58 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/10/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br /> <br />AGREEMENT OF ELECTRIC SERVICE FOR STREET LIGHTS <br /> ENERGY AND MAINTENANCE RATE <br /> AEC OWNED FACILITIES <br /> <br />Agreement made , 19 ,between Anoka Electric <br /> <br />Cooperative (hereinafter called AEC), and <br /> <br />! <br />I <br /> <br />(hereinafter called the Customer), a Municipality. <br /> <br />AEC shall sell and deliver energy to the Customer for the purpose <br />of Street Lighting. The street lighting costs shall include a <br />monthly rate to cover energy usage and routine maintenance. <br /> <br />After the street light installation is 20 years old, AEC will <br />repair damaged equipment when the damage is not associated with the <br />age of the street lighting system. If in AEC's opinion, the <br />condition of the street lighting system is such that replacement <br />or significant renovation of the system is necessary, the Customer <br />shall have two options. The Customer may either reimburse AEC for <br />the installed cost of the replacement system, or the customer can <br />transfer from the Energy and Maintenance Rate to the regular rate <br />for AEC owned street lights. <br /> <br />To qualify for this rate, the Customer shall pay or have paid an <br />Aid-To-Construction fee as specified in Administrative Rule 214a. <br /> <br />Monthly costs are to be consistent with AEC's Rate B19. <br /> <br />For AEC <br /> <br />WITNESS: .... AEC <br /> <br /> General Manager <br /> <br /> For Customer <br /> <br />WITNESS: CUSTOMER <br /> <br />Revised 2/90 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.