My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/28/1990
Ramsey
>
Public
>
Agendas
>
Council
>
1990
>
Agenda - Council - 08/28/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:00:45 AM
Creation date
12/4/2003 3:47:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/28/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> FEASIBILITY REPORT <br /> FOR <br />SANITARY SEWER AND WATERMAIN <br />CITY PROJECT 90-27 <br /> CITY OF RAMSEY, MINNESOTA <br /> <br />INTRODUCTION <br /> <br />This report is prepared in response to a petition for public <br />sewer and water extended to a parcel of land north of Nowthen <br />Boulevard and west of State Trunk Highway 47. The property <br />to be served is an approximate 12 acre parcel, zoned B1, <br />identified by Anoka County PIN 25-32-25-31-0003 as shown on <br />enclosed exhibits. It is the "triangular" piece of property <br />north of the intersection of the two highways. <br /> <br />II. EXISTING FACILITIES AND PROPOSED FACILITY EXTENSION <br /> <br />Sanitary sewer exists along the alignment of 142nd Lane <br />between Dysprosium and Waco Street. Extension to this property <br />in' best accomplished by construction northerly from an <br />existing manhole in the east right of way of Trunk Highway 47 <br />and with construction under Trunk Highway 47 by jacking or <br />boring methods. The proposed sewer line would be an 8 inch <br />size intended for lateral service. <br /> <br />Watermain exists along the alignment of 142nd Lane, parallel <br />to the sewer, and also at the water tower site which is across <br />Nowthen Boulevard from the property. Service to the property <br />is best and most economically provided by construction from <br />the water tower site under Nowthen Boulevard, by jacking or <br />boring° <br /> <br />III. ESTIMATED COSTS <br /> <br /> Sanitary sewer, 1100 L.F., including <br /> jacking of T.H. 47 and manholes <br /> <br /> Watermain 175 L.F. including jacking <br /> of Nowthen Blvd. <br /> <br />Construction contingency 15% <br /> <br />Estimated construction cost <br /> <br />Incidental costs 30% <br /> <br />Estimated project cost <br /> <br />$36,100 <br /> <br /> 13,350 <br /> <br />$49,450 <br /> 7,400 <br /> <br />$56,850 <br /> <br /> 17,150 <br />$73,000 <br /> <br />1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.