Laserfiche WebLink
I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! <br />I <br />i <br />I <br />I <br /> <br /> TABLE I <br />ESTIMATED COSTS (THROUGH STREET~ <br /> <br />Item <br /> <br />Estimated <br /> Cost <br /> <br />Bituminous Surfacing <br />Class V Gravel <br />Shaping, Grading & Restoration <br />Drainage Improvements <br /> Estimated Construction Cost: <br /> Contingencies, Eng. & Admin.: <br />Estimated Project Cost: <br /> <br />$29,300.00 <br />$14,000.00 <br />$13,300.00 <br /> $2,000.00 <br />$58,600.00 <br />$20,500.00 <br />$79,100.00 <br /> <br />The following table shows the estimated project <br />constructing Bison Street as a cul-de-sac: <br /> <br />costs for <br /> <br /> TABLE II <br />ESTIMATED COSTS FOR BISON STREET <br /> <br />CUL-DE-SAC ALTERNATIVE <br /> <br />Item <br /> <br />Bituminous Surfacing <br />Class V Gravel <br />Shaping, Grading & Restoration <br />Drainage Improvements <br /> Estimated Construction Cost: <br /> Contingencies, Eng. & Admin: <br />Estimated Project Cost: <br /> <br />Estimated <br /> Cost <br /> <br />$27,800.00 <br />$13,300.00 <br />$12,400.00 <br /> $1,500.00 <br />$55,000.00 <br />$18,150.00 <br />$73,150o00 <br /> <br />FINANCING AND ASSESSMENT <br /> <br />In accordance with the City of Ramsey's current street assessment <br />policy, the proposed improvements are proposed to be financed by <br />special assessments to the benefited property on a per unit basis. <br />The total number of assessed units as shown on Exhibit A is 14.5 <br />for the through street alternate and 13.5 for the cul-de-sac <br /> <br />alternate. <br /> <br /> <br />