Laserfiche WebLink
I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />! <br />I <br />I <br />i <br /> <br />in Block 2, Golden Eagle Estates. The south end of Bison Street <br />may also require ponding easements and a portion of the street <br />could drain south to Trott Brook. <br /> <br />ESTIMATED COSTS <br /> <br />The estimated project costs presented herein reflect the <br />construction costs and overhead costs. Construction costs are <br />estimated contract amounts for the actual construction. Overhead <br />costs include, but are not limited to, right-of-way, engineering, <br />construction staking and inspection, fiscal and legal, contingency, <br />and administration. Overhead costs for the project are estimated <br />based on percentages of construction cost° Those percentages are <br />estimated to be as follows: <br /> <br />- Engineering 10% <br />- Staking & Inspection 7% <br />- Fiscal & Legal 3% <br />- Contingencies 5% <br />- Administration & Escrow 5% <br />- Right-of-Way 5% <br /> <br />The estimated cost of construction plus overhead are shown as the <br />estimated project cost. <br /> <br />The following table shows the estimated- project <br />constructing Bison Street or a through street: <br /> <br />costs for <br /> <br /> <br />