My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 12/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:41:17 AM
Creation date
12/11/2013 10:22:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01340 <br />SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES <br />PART 1- GENERAL <br />1.1 DESCRIPTION <br />A. Work included: Make submittals required by the Contract Documents, and revise and <br />resubmit as necessary to establish compliance with the specified requirements. <br />B. Related work: <br />1. Documents affecting work of this Section include, but are not necessarily <br />limited to, General Conditions, Supplementary Conditions, and Sections in <br />Division 1 of these Specifications. <br />2. Individual requirements for submittals also may be described in pertinent <br />Sections of these Specifications. <br />C. Work not included: <br />1. Unrequired submittals will not be reviewed by the Architect. <br />2. The Contractor may require the subcontractors to provide drawings, setting <br />diagrams, and similar information to help coordinate the Work, but such data <br />shall remain between the Contractor and the subcontractors and will not be <br />reviewed by the Architect. <br />1.2 QUALITY ASSURANCE <br />A. Coordination of submittals: <br />1. Prior to each submittal, carefully review and coordinate all aspects of each item <br />being submitted. <br />2. Verify that each item and the submittal for it conform in all respects with the <br />specified requirements. <br />3. By affixing the Contractor's signature to each submittal, certify that this <br />coordination has been performed. <br />1.3 SUBMITTALS <br />A. Make submittals of Shop Drawings, Samples, and other items in accordance with the <br />provisions of this Section. <br />PART 2 - PRODUCTS <br />2.1 SHOP DRAWINGS <br />A. Scale and measurements: Make Shop Drawings accurately to a scale sufficiently large <br />to show all pertinent aspects of the item and its method of connection to the Work. <br />01340-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.