My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 12/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:41:17 AM
Creation date
12/11/2013 10:22:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01345 <br />SUBSTITUTIONS <br />PART 1 - GENERAL <br />1.1 DESCRIPTION <br />A. Work included: Submit supporting data for substitutions proposed in the Contract <br />Documents. <br />B. Related work: <br />1. Documents affecting work of this Section include, but are not necessarily <br />limited to, General Conditions, Supplementary Conditions, and Sections in <br />Division 1 of these Specifications. <br />2. Individual requirements for submittals also may be described in pertinent <br />Sections of these Specifications. <br />1.2 QUALITY ASSURANCE <br />A. Substitutions: <br />1. The Contract is based on the standards of quality established in the <br />Contract Documents. Substitutions will be considered only when listed at time of <br />bidding, on the form provided therefore in the bidding documents, and when <br />substantiated by the Contractor's submittal of required data within 35 calendar <br />days after award of the Contract. <br />2. The following products do not require further approval except for interface <br />within the work. <br />a. Products specified by reference to standard specifications such as <br />ASTM and similar standards. <br />b. Products specified by manufacturer's name and catalog model <br />number. <br />3. Do not substitute materials, equipment, or methods unless such <br />substitution has been specifically approved in writing for this Work by the <br />Architect. <br />C. "Or equal": <br />1. Where the phrase "or equal," or "or equal as approved by the Architect," <br />occurs in the Contract Documents, do not assume that the materials, equipment, <br />or methods will be approved as equal unless the item has been specifically so <br />approved for this Work by the Architect. <br />2. The decision of the Architect shall be final. <br />01345-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.