My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 12/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:41:17 AM
Creation date
12/11/2013 10:22:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Adhesive: To adhere insulation and seal joints, type recommended by <br />manufacturer. <br />D. Rope wicks: 1/4" diameter polyester cord with cotton core. <br />E. Compressible joint filler: Closed cell, soft neoprene gasket, cut to size. <br />PART 3 - EXECUTION <br />3.1 SURFACE CONDITIONS <br />A. Examine the areas and conditions under which work of this Section will be <br />performed. Correct conditions detrimental to timely and proper completion of <br />the Work. Do not proceed until unsatisfactory conditions are corrected. <br />3.2 ENVIRONMENTAL CONDITIONS <br />A. Do not place masonry units when air temperature is below 40 degrees F. <br />B. Protect masonry construction from direct exposure to wind and sun when <br />erected in ambient air temperature of 99 degrees F in the shade, with relative <br />humidity less than 50%. <br />3.3 INSTALLATION <br />A. General <br />1. Do not commence installation of the work of this Section until <br />horizontal and vertical alignment of foundation is within 1" of plumb <br />and the lines shown on the Drawings. <br />2. Lay only dry masonry units. <br />3. Use masonry saws to cut and fit masonry units. <br />4. Set units plumb, true to line, and with level courses accurately <br />spaced. <br />5. Clean the top surface of foundation free from dirt, debris, and laitance, <br />and expose the aggregate prior to start of installing first course. <br />6. Accurately fit the units to plumbing, ducts, openings, and other <br />interfaces, neatly patching all holes. <br />7 Keep the walls continually clean, preventing grout and mortar stains. <br />If grout does run over, clean immediately. <br />04220-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.