My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 12/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:41:17 AM
Creation date
12/11/2013 10:22:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Commencement of work by installer is acceptance of substrate conditions. <br />3.02 PREPARATION <br />A. Install Cultured Stone® products in accordance with manufacturer's Cultured Stone® <br />installation instructions using grouted joints. <br />B. Install architectural trim products in accordance with manufacturer's Cultured Stone® <br />installation instructions. <br />C. Install/Apply Related Materials specified above in accordance with type of substrate and <br />manufactured masonry manufacturer's installation instructions. <br />3.03 CLEANING <br />A. Clean manufactured masonry in accordance with manufacturer's installation instructions. <br />3.04 PROTECTION <br />A. Protect finished work from rain during and for 48 hours following installation. <br />B. Protect finished work from damage during remainder of construction period. <br />END OF SECTION <br />04730-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.