Laserfiche WebLink
3.1 PROJECT CONDITIONS <br />A. Architectural woodwork shall not be installed until masonry or other wet <br />operations are complete. The building shall be properly ventilated with proper <br />temperature and humidity maintained during and following installation. <br />3.2 INSTALLATION <br />A. Installation of millwork and cabinet work shall be in accordance with <br />AWI Quality Standards Section 1700 - Installation of Architectural Woodwork. <br />1. Cabinets shall be installed so that doors and drawers fit openings, <br />without distortion, and are accurately aligned, with hardware adjusted to center <br />doors in openings. <br />2. Tops shall be securely anchored to base cabinets, set level and <br />scribed to walls. <br />B. Woodwork shall be installed by experienced finish carpenters. Erect <br />work plumb, true and square and securely anchored to grounds and blocking. <br />Install neatly, free of slivers, open joints and hammer and tool marks. Scribe and <br />cut work to fit adjoining surfaces. Blind nail insofar as possible and set surface <br />nails. <br />06400-3 <br />