Laserfiche WebLink
5. Glazing - <br />a. High-performance insulating Low E glass. <br />6. Sizes as shown on the Drawings. <br />PART 3 - EXECUTION <br />3.1 INSTALLATION <br />A. Windows shall be installed straight, plumb, and level without spring or twisting <br />and securely anchored in place in accordance with manufacturer's <br />recommendations and details. <br />B. Apply sealants in sufficient quantity to provide a watertight seal between <br />windows and surrounding construction. <br />1. Refer to Section 07900 for sealant materials and methods of installation. <br />3.2 CLEANING <br />A. Clean surfaces properly after installation of components, removing all excess <br />sealant compound, dirt and other substances. <br />08610-2 <br />