My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 12/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:41:17 AM
Creation date
12/11/2013 10:22:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Edge stripping shall be tackless type. <br />D. Provide other materials, not specifically described but required for a complete <br />and proper installation, as selected by the Contractor subject to the approval of <br />the Architect. <br />PART 3 - EXECUTION <br />3.1 SURFACE CONDITIONS <br />A. Examine the areas and conditions under which work of this Section will be <br />performed. Correct conditions detrimental to timely and proper completion of <br />the Work. Do not proceed until unsatisfactory conditions are corrected. <br />3.2 SURFACE PREPARATION <br />A. Field measure each space to receive carpeting, as a basis of supplying, cutting <br />and seaming the carpet. Do not scale the Drawings or calculate sizes from <br />dimensions shown. The Contractor shall verify all dimensions of the carpeting <br />at the building site before cutting and supplying carpet. <br />B. Make substrata level and free from irregularities, assure one constant floor <br />height after carpet is installed, filling low spots and grinding high spots as <br />required. Vacuum substrate immediately prior to carpet installation. <br />C. Do not proceed with carpet installation until work of all other trades, including <br />painting, is completed and Architect's approval has been given. <br />3.3 INSTALLATION <br />A. Comply with manufacturer's printed instructions and recommendations for the <br />carpet selected. <br />B. Install carpet wall to wall, using continuous lengths and as broad widths as <br />possible to minimize the placement of seams in traffic areas. Cross seams <br />should be held to an absolute minimum. Make all seams so the pile of the <br />adjoining pieces have the same directional run and be practically invisible. <br />C. Extend carpet under open -bottomed and raised -bottom obstructions, and under <br />removable flanges of obstructions. Extend carpet into closets and alcoves of <br />rooms indicated to be carpeted, unless another floor finish is indicated for such <br />spaces. <br />09680-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.