My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 12/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:41:17 AM
Creation date
12/11/2013 10:22:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Brookfield 4th Addition <br />Final Plat Request <br />Engineering Review 12-5-13 <br />Page 3 of 5 <br />A permit from the Lower Rum River Water Management Organization has been obtained, the <br />conditions of the permit applicable to contractors must be noted on the plans. <br />Utilities: All lots are proposed to be served by municipal sewer and water. Construction plans and <br />specifications are subject to review of the City Engineering Department. <br />Plan sheet specific comments are listed at the end of this report. <br />Park Dedication: The park dedication shall be satisfied with a cash payment as was <br />recommended for the preliminary plat of Brookfield Addition. <br />Trail Fee: Trail Fees must be paid for new lots created prior to release of the final plat for <br />recording. <br />Sewer and Water Trunk Fee: This property is included in the Trunk Utility executed between <br />Oakwood Development and the City of Ramsey. Trunk sewer and water fees must be paid for all <br />new lots being created. The rate in effect at the time of final plat approval must be paid prior to <br />the City's release of the final plat for recording. <br />Stormwater Management Fee: A stormwater management fee must be paid for all new lots <br />being created. The rate in effect at the time of final plat approval must be paid prior to the City's <br />release of the final plat for recording <br />Stormwater Pollution Prevention Plan: Hydraulic Grade calculations must be submitted for the <br />storm sewer system. A copy of the stormwater calculations provided to the LRRWMO for plan <br />approval must be submitted to the City. <br />Plan sheet specific comments. <br />Sheet C2: The following changes are required: <br />• Water service insulation must be shaded. <br />• Add risers to profile for each sanitary sewer service. Sewer service on each lot must be <br />edited to match profile elevations. <br />• Check and update inverts based on length of pipe and slope. ALL UTILITY PROFILE <br />SHEETS. <br />• Storm sewer crossing in profile between MH 1 and MH 2 does not match plan view <br />stationing. The size of the pipe is not at the scale of the profile. <br />• The starting point for the sanitary sewer is an existing stub and should be labeled <br />appropriately. Verify elevation and alignment of existing stub prior to starting watermain. <br />A manhole may be needed to correct sanitary sewer alignment. <br />• Add note: "All 6" DIP watermain shall be Class 53." <br />• Add North invert to MH 3 label. <br />
The URL can be used to link to this page
Your browser does not support the video tag.