My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 12/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:41:17 AM
Creation date
12/11/2013 10:22:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 each wall hung lavatories with concealed arm carriers, chrome ADA handles and insulated traps. <br />Provide tempering valves. <br />1 each fiberglass janitors sink with chrome faucet. <br />1 each fiberglass mop sink with chrome wall mount faucet with bucket holder. <br />5 each floor drains with brushed nickel covers. <br />Floor clean outs per code with brushed nickel covers. <br />Wall hung stainless steel NSF hand sink and gooseneck chrome faucet and insulated trap. <br />Wall hung high /low drinking fountain with cooling and bottle filler. <br />40 gallon natural gas water heater, .07 EF Rated, vented to outside air. <br />2 each Woolford keyed hosebibs. <br />2 each interior hosebibs. <br />1 each 3" diameter grease trap in floor mounted <br />Supply, waste and vent piping for three compartment sink. Faucet, trap and drain provided by others <br />and installed by this plumber. <br />Natural gas piping for water heater and furnace, with valves, unions, dirt legs, etc. <br />Order and coordinate installation of the gas meter by Centerpointe Energy. Coordinate pressure and <br />size with HVAC subcontractor. <br />HVAC Specifications: <br />This is a "Design — Build" HVAC contract. The work includes all necessary HVAC drawings, and other <br />design information and certification required by the City of Ramsey to obtain a building permit. All code <br />required HVAC construction whether listed below or not is to be included in the HVAC bid. The cost of <br />City of Ramsey HVAC permit fees is to be included. The minimum Owner requirements are as follows: <br />100,000 BTU 95% minimum efficiency forced air upflow furnace. <br />5 Ton 17.5 Seer minimum air conditioning condenser / coil. <br />Supply and return ductwork, with manual dampers. <br />Baked enamel grilles and registers. <br />Restroom ventilation fans, sized for code air exchanges. <br />Concession Area ventilation fan, 500 CFM. <br />
The URL can be used to link to this page
Your browser does not support the video tag.