Laserfiche WebLink
I DUANE C. ~RACB & ASSO~. <br /> B~ilding Codel Consultants <br />i '' 4375 Mc#enemy. Street <br /> Vadnais Heights, MN. 55127 <br /> 612{490-0142 <br /> <br />· October 16.~..1.990..'... <br /> <br />Mr Glyn Huff <br />Building Official <br />City of .R.amsey ...:. . ..... ..... <br /> <br />Re~ Ve-Ve Inc. <br /> <br />Glyn, ! have the FAX d~awings you sent me to-day and will ~ry~'~and <br />respond. The first sheet is a.little hard to read, so I may. ge~ <br />something off a li=tle. <br /> ~ . <br />It would appear that e~cept for the paint room and With tha~ <br />should be ~ome storage area, we will need to know how big and what <br />they store there, that ~he rest of the building is really used as.a <br />B-~ occupancy. From your description and the allowable area it wodld <br />seem that this must b~'a Type ¥-N construction. I am assuming.nO <br />sprinkler system. ' ' .': "' .. <br /> <br />As you noted the building could be given credit for a 100% increase· <br />in area so that the 8,000 sq. ft. allowable from Table 5-C will now. <br />become 16,000 sq. ft. (I am going to guess that if they told Clayton <br />much about th~ business at the time of the construction it was mostly <br />storage and so possibly could have be~n thought of as an unlimited. <br />area type use.) <br /> <br />Tell me a little more about what thmy do in the 60 x 80 shop where <br />the welding is done. .' " <br /> <br />At this point even if we do not classify it any other than a .B~2 ~ith <br />an H-2 paint room the building would not ~llow a 5,400 sq. ft.. <br />addition without eithe~ some area separation walls (2-hr. with a <br />parapet) or a sprinkler system. As presently designed it is all One <br />building and should include in the area the little storage garage <br />placed on the North end of the building. <br /> <br />Give me a call at your.convience and we will discuss this some more <br /> <br /> <br />