Laserfiche WebLink
comfortable ride and new onboard Wi -Fi service offer an increasingly attractive package for <br />work travelers." <br />Metro Transit 2013 Ridership Summary <br />Urban <br />Local Bus <br />Suburban <br />Local Bus <br />1 <br />1,630,270 <br />0 <br />1 <br />8 <br />Var. <br />1.0% <br />% of <br />total <br />rides <br />Light Rail <br />Commuter <br />Rail <br />TOTAL <br />162,919;; <br />787,239 <br />81,368,750 <br />- 335,317 <br />700,276 86,963 <br />315,244 <br />- 3.2 % <br />12.4% <br />0.4% <br />1 1% <br />121 <br />12% <br />- 30,770 <br />0,498,236 <br />1,053,506 <br />Metro Transit is a service of the Metropolitan Council. <br />- 1.9% <br />6 <br />*- includes 795,157 rides on Metro Transit service contracted by Maple Grove Transit. <br />2 °A <br />100% <br />IT Department. The Fire department was moved successfully over to Fire Station 1 with little <br />complications from a technology standpoint. The IT Department also installed Wi -Fi in the Public <br />Works Park and Streets trailer and plans are in the works to add Wi -Fi to the Fire Station 1 as well. <br />Engineering <br />Improvement Project Updates — <br />• Highway 10 /Armstrong Boulevard Interchange - <br />o Anoka County contracted with SRF Consulting Group to complete final design <br />plans and specifications by the spring /summer of 2014. <br />o SRF Consulting Group will provide a final design progress update at the City <br />Council meeting on Tuesday, February 11 <br />o Construction is proposed to begin in the fall of 2014, contingent on receipt of the <br />necessary remaining funding. <br />o Construction duration is currently estimated at 18 to 22 months. <br />o More information on this project, including project contact information and public <br />open house dates, is available @ http: / /www.highway1Oandarmstrong.com <br />• Armstrong Boulevard Trail Extension (Alpine Drive - 161s Avenue) - <br />o Tree removal operations will occur this winter. <br />o Construction will be complete by the end of June. <br />• Mississippi River Trail (King's Island - Traprock Street) - <br />o Tree clearing on King's Island began December of 2013. <br />o Construction will be completed in 2014. <br />