Laserfiche WebLink
CITY OF RAMSEY <br />AUGUST 20, 1991 <br />PAGE TWO <br /> <br />TASK 3 RIGHT-OF-WAY MAP <br /> <br />After the City Engineer's review of preliminary design as submitted by MSA, we <br />shall prepare a right-of-way map to State Aid standards showing routing <br />alignment and property acquisitions required to extend 153rd Avenue N.W. as <br />shown by Exhibit 1. Legal descriptions of right-of-way acquisitions will be <br />provided. <br /> <br />The level of effort and cost of engineering services are estimated as <br />followed: <br /> <br />TASK 1 <br /> <br />SURVEY & MAPPING <br /> <br />2 Man Survey Crew <br />Registered Land Surveyor <br />Design Technical <br />Direct Expense <br /> <br />Estimated Cost <br /> <br />20 hrs. <br /> 4 hrs. <br />16 hrs. <br />$ 6OO.OO <br /> <br />$2200.00 <br /> <br />TASK 2 <br /> <br />PRELIMINARY DESIGN <br /> <br />Project Engineer <br />Design Technician <br />Secretarial <br />Direct Expense <br /> <br />Estimated Cost <br /> <br /> 8 hrs. <br />16 hrs. <br />4 hrs. <br />$ 400. O0 <br /> <br />$2000.00 <br /> <br />TASK 3 <br /> <br />RIGHT-OF-WAY <br /> <br />Project Engineer <br />Registered Land Surveyor <br />Design Technician <br />Secretarial <br />Direct Expense <br /> <br /> 4 hrs. <br />10 hrs. <br />12 hrs. <br />4 hrs. <br />$ 200.00 <br /> <br />Estimated Cost Service $2000.00 <br /> <br /> <br />