Laserfiche WebLink
7550 Sunwood Drive NW • Ramsey, Minnesota 55303 <br />City Hall: 763-427-1410 • Fax: 763-427-5543 <br />www.ci.ramsey.mn.us <br />April 22, 2014 <br />Mr. Douglas W. Fischer, P.E. <br />Division Manager / County Engineer <br />Anoka County Transportation Division <br />1440 Bunker Lake Boulevard NW <br />Andover, MN 55304 <br />'RE: Transportation Investment Generating Economic Recovery (TIGER) Discretionary Grant <br />Dear Mr. Fischer: <br />The City of Ramsey is very pleased to offer you this letter of support in regard to Anoka County's grant <br />applications for the federal TIGER Discretionary Grant program for both a capital construction request <br />and a planning request for two separate projects on particularly notorious sections of U.S. Highway 10 <br />(US 10) in Anoka County. <br />With regards to the capital construction request, replacing the existing at -grade intersection at US 10 <br />and Anoka County 83 (Armstrong Boulevard) with an interchange and an overpass of the Burlington <br />Northern Santa Fe (BNSF) railroad will improve quality of life, safety, mobility and support existing and <br />future economic growth and development in Anoka County and the City of Ramsey. Eliminating the <br />traffic signal and at -grade crossing of the BNSF Railroad will make it safer and easier for all modes (bus, <br />rail transit, passenger vehicles, commercial vehicles, pedestrians and bicyclists) to access the Northstar <br />Commuter Rail Station, employment nodes, medical clinics (including the Veterans Administration's <br />Clinic),schools, homes and service centers located within the interchange influence area. Anoka County <br />proposes to leverage federal funds with more than a 70% match from local, regional, and state <br />resources, and this final "gap" funding will make this shovel ready project a reality. <br />With regards to the planning request, Anoka County and the Minnesota Department of. Transportation <br />(MnDOT) are concluding a new study in the Cities of Anoka and Ramsey on the US 10 corridor. While <br />the US 10/Armstrong interchange is still the number one priority on this highway, there are still similar <br />issues at four other intersections on this corridor. What is exciting to see from this most recent study's <br />findings is that by using state-of-the-art interchange types, access management techniques, and traffic <br />management systems, we now feel that we can achieve 92% of the congestion relief and 95% of the <br />safety benefit while reducing the projected cost from $300 million to $125 million! The planning grant <br />request will take these preliminary findings within the City of Anoka's portion of this corridor and <br />develop preliminary engineering and environmental review documents for the proposed improvements <br />on US 10 at Fairoak Avenue and Thurston Avenue. This is the section of highway where the most recent <br />fatality of a 16-year old girl occurred and was the 12th such fatality on this corridor since 2003. We must <br />take action to eliminate these preventable deaths and the Tiger Planning grant will launch this effort. <br />