Laserfiche WebLink
Finally, several of the potential twelve projects may not be possible to be considered for <br />both alternative A and B. For example, Ute Street has only a 33-foot right-of-way, which <br />would be insufficient to accommodate the ditches required for drainage under alternative <br />A. In this case, only a paved roadway with curb and gutter may be possible. <br /> <br />Action: <br /> <br />Based upon discussion <br /> <br />Reviewed by: <br /> <br />Director of Public Works/Fire Chief <br />Principal City Engineer <br />Street Maintenance Supervisor <br /> <br />PW: 03/18/03 <br /> <br /> <br />