My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/13/2014
Ramsey
>
Public
>
Agendas
>
Council
>
2014
>
Agenda - Council - 05/13/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:19:09 PM
Creation date
5/14/2014 3:59:03 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/13/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7080.2220 INDIVIDUAL SUBSURFACE SEWAGE TREATMENT SYSTEMS 50 <br />Subp. 2. Location of mounds. <br />A. The upper 12 inches of the original soil mound absorption area must have a mound <br />absorption ratio of greater than zero under part 7080.2150, subpart 3, item E, Table IX or IXa. The upper <br />12 inches of the absorption area must also be above the periodically saturated soil or bedrock. <br />B. Setbacks must be according to Table VII in part 7080.2150, subpart 2, item F. Setbacks must <br />be measured from the original soil absorption area. <br />C. On slopes of one percent or greater and where the original soil mound absorption ratio is <br />5.0 or greater in Table IX or 1Xa in part 7080.2150, subpart 3, item E, mounds must not be located where the <br />ground surface contour lines that lie directly below the long axis of the distribution media bed represent a <br />swale or draw, unless the contour lines have a radius of curvature greater than 100 feet. Mounds must never <br />be located in swales or draws where the radius of curvature of the contour lines is less than 50 feet. <br />Subp. 3. Mound design and construction. <br />A. The mound distribution media bed area consists of bottom area only and must be calculated <br />by dividing the design flow by 1.2 gallons per square foot per day. <br />B. Mound distribution media beds must be determined according to part 7080.2150, subpart <br />3, item M, and must be no wider than ten feet. <br />C. Clean sand must be used to elevate the mound distribution media bed and must consist of <br />sound, durable material that conforms to the following requirements: <br />Sieve Size <br />No. 4 <br />No. 8 <br />No. 10 <br />No. 40 <br />No. 60 <br />No. 200 <br />Percent Passing <br />95-100 <br />80-100 <br />0-100 <br />0-100 <br />0-40 <br />0-5 <br />Clean sand must also contain less than three percent deleterious substances and be free of organic <br />impurities. <br />D. The original soil mound absorption area is determined by multiplying the original soil <br />mound absorption length by the original soil mound absorption width. The original soil mound absorption <br />width is calculated by multiplying the mound distribution media bed width by the mound absorption ratio. <br />The mound absorption ratio of the upper 12 inches of soil in the proposed original soil mound absorption <br />area shall be determined according to Table IX or IXa in part 7080.2150, subpart 3, item E. <br />E. The required original soil absorption width for mounds constructed on slopes from zero to <br />one percent must be centered under the mound distribution media bed width. The required original mound <br />soil absorption width constructed on slopes greater than one percent must be measured downslope from the <br />upslope edge of the mound distribution media bed width and measured in the direction of the original land <br />slope and perpendicular to the original contours. <br />Copyright ©2014 by the Rev <br />so <br />of Statutes, State of Minnesota. All Rights Reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.