My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/13/2014
Ramsey
>
Public
>
Agendas
>
Council
>
2014
>
Agenda - Council - 05/13/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:19:09 PM
Creation date
5/14/2014 3:59:03 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/13/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
51 INDIVIDUAL SUBSURFACE SEWAGE TREATMENT SYSTEMS 7080.2220 <br />F. The side slopes on the mound must not be steeper than three horizontal units to one vertical <br />unit and shall extend beyond the required original soil absorption area, if necessary. <br />G. Distribution of effluent over the mound distribution media bed must be by level perforated <br />pipe under pressure according to parts 7080.2050 and 7080.2100. <br />H. The supply pipe from the pump to the original soil absorption area must be installed before <br />surface preparation of the original mound soil absorption area. The trench excavated for the supply pipe <br />must be carefully backfilled and compacted to prevent seepage of effluent. <br />I. Vegetation in excess of two inches in length and dead organic debris including leaf mats must <br />be removed from the original soil mound absorption area. Trees must be cut nearly flush with the ground <br />and stumps must not be removed. <br />J. The original soil mound absorption area must be roughened by backhoe teeth, moldboard, <br />or chisel plow. The soil must be roughened to a depth of eight inches. Discing is allowed if the upper eight <br />inches of soil has a texture of sandy loam or coarser. If plowed, furrows must be thrown uphill and there <br />must not be a dead furrow in the original soil mound absorption area. A rubber -tired tractor is allowed for <br />plowing or discing. Rototilling or pulverizing the soil is not allowed. The original soil must not be excavated <br />or moved more than one foot from its original location during soil surface preparation. <br />K. Prior to placement of six inches of clean sand, vehicles must not be driven on the original <br />soil mound absorption area before or after the surface preparation is completed. The clean sand must <br />immediately be placed on the prepared surface. <br />L. The clean sand must be placed by using a construction technique that minimizes compaction. <br />If the clean sand is driven on for construction, a crawler or track -type tractor must be used. At least six inches <br />of sand must be kept beneath equipment to minimize compaction of the prepared surface. <br />M. A minimum of 12 inches of clean sand must be placed in contact with the bottom area of the <br />mound distribution media bed and must be uniformly tapered to cover the entire original soil absorption area. <br />Other sandy materials are allowed to be used outside of this area to complete construction of the mound. <br />N. The top of the clean sand layer upon which the mound distribution media bed is placed must <br />be level in all directions. <br />O. A vertical inspection pipe at least four inches in diameter must be installed and secured <br />at the distribution medium and sand interface. The inspection pipe must have three -eighths inch or larger <br />perforations spaced vertically no more than six inches apart. At least two perforations must be located in the <br />distribution medium. Perforations must not be located above the permeable synthetic fabric, if used. The <br />inspection pipe must extend to the bottom of the distribution medium, be secured, and be capped, flush with <br />or above finished grade. <br />P. On slopes of one percent or greater, the upslope edge of the mound absorption bed must be <br />placed on the contour. <br />Q. The sidewalls of the mound absorption bed must be as vertical as practical and not <br />intentionally sloped. <br />R. The top of the mound distribution media bed must be level in all directions. <br />S. A minimum of six inches of sandy to loamy soil material must be placed on the top of the <br />mound absorption bed and sloped upwards toward the center of the mound a minimum of ten horizontal <br />units to one vertical unit. <br />Copyright ©2014 by the Rev <br />so <br />of Statutes, State of Minnesota. All Rights Reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.