My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/13/2014
Ramsey
>
Public
>
Agendas
>
Council
>
2014
>
Agenda - Council - 05/13/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:19:09 PM
Creation date
5/14/2014 3:59:03 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/13/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our Mission: Toworktogethertoresponsilygrow ourcommunity and topnoiriIt quality,cost-effective, and of&cfentgovernmentseivices <br />CC Regular Session <br />Meeting Date: 05/13/2014 <br />By: Bruce Westby, Engineering/Public Works <br />Information <br />Title: <br />Consideration of accepting plans and specifications and authorizing bids for Improvement Project 14-01, 2014 Street Maintenance Program Phase 2. <br />7. 6. <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to request Council acceptance of plans and specifications and authorization to advertise bids for Improvement Project 14-01, 2014 <br />Street Maintenance Program Phase 2. <br />Background: <br />On April 29th, the City Council accepted bids and awarded contracts for Division A and B of the 2014 Street Maintenance Program. At that time, it was <br />discussed that the bids were very favorable and that the difference between the engineer's estimate and the low bids was approximately $116,000. Based on <br />recent discussions regarding the importance of maintaining the City's aging street system on a routine basis, and the fact that the City has not been routinely <br />maintaining its streets, Council directed staff to consider some other streets that would be good candidates for another street maintenance project to be let in <br />2014, and to present the project to Council for approval. <br />Staff reviewed the City streets database and identified approximately 6 miles of streets that would be good candidates for Phase 2 of the 2014 SMP. Attached to <br />this case is a map showing the streets included in the previously approved 2014 Street Maintenance Program, as well as the newly selected streets that are <br />proposed to be bid as Phase 2 of the 2014 Street Maintenance Program. Also attached are three maps (L, M, and N) that show the proposed Phase 2 streets in <br />more detail. These streets are all proposed to be crack -sealed and sealcoated to help protect and preserve the pavement from the negative effects of the sun, <br />stormwater runoff, and other petroleum products that are deposited on the pavement over time by vehicles. The same specifications that were used for the <br />Division A (crack -seal and sealcoat) projects of Improvement Project 14-00 will also be used for Improvement Project 14-01. <br />Notification: <br />No notifications were required for this case. <br />Observations/Alternatives: <br />Observations: <br />The estimated total cost for all improvements identified as Improvement Project 14-01 is $156,736. This amount is significantly more than the $116,000 of <br />excess funds from IP 14-00. If Council only wishes to spend funds closer to the $116,000 that was left from IP 14-00, staff recommends pulling the streets <br />identified on Map L (Riverwood) from the project. The estimated construction cost for the Map L streets is $29,736 which results in a total project cost of <br />127,000. The estimated costs of the other two project areas are as follows; Map M (Highpoint) = $51,158, and Map N (Golden Eagle) = $75,841. Any <br />combination of these project areas may be bid, depending on the desired project cost. <br />Staff also reviewed options for completing one or more overlay projects in place of more sealcoating projects, but based on the streets database staff believes it <br />will be most cost-effective to sealcoat another 6 miles of City streets than it would be to overlay another half -mile of streets. <br />Alternatives: <br />Alternative #1 - Motion to accept plans and specifications and authorize advertisement for bids for Improvement Project 14-01, 2014 Street Maintenance <br />Program Phase 2. <br />Alternative #2 - Motion denying authorization to advertise for bids at this time. <br />Alternative #3 - Motion of other. <br />Funding Source: <br />The 2014 budget includes $500,000 in the general fund for street maintenance projects. No assessments are proposed to fund any portion of the 2014 Street <br />Maintenance Program. <br />Staff anticipates that bid prices will be less than the estimated costs presented above but if bids are higher than staffs estimated costs, one or more sealcoat <br />segments will be removed to reduce project costs to an amount equal to or less than $500,000. <br />On April 29th it was also discussed that approximately $522,000 of funds that were budgeted for street maintenance projects in 2013 were never spent, and that <br />these funds could be spent on street maintenance projects in 2014. Below is a breakdown of the 2013 General Fund budget, which included $1,327,500 for street <br />maintenance projects. Offsetting revenues identified to support the budgeted expenditures included $275,000 from TIF 4, $244,493 from the Public <br />Improvement Revolving (PIR) Fund, $577,500 from Engineering Revenue generated from in-house engineering design and construction staking and inspection <br />activities on the Riverdale Drive project and other authorized road reconstruction projects estimated at $1.5M (of which only the 2013 Street Maintenance <br />Program was completed). The remaining $230,507 was identified to come from the General Property Tax Levy as shown below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.