My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/20/2014
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2014
>
Agenda - Public Works Committee - 05/20/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:39:02 AM
Creation date
5/28/2014 11:42:49 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/20/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The consensus of the Public Works Committee was to recommend that the City Council <br />postpone any action on a Comprehensive Plan Amendment until the Highway 10 Access <br />Planning Study is complete specific to the Village Bank proposal and that those concepts should <br />not impact the PSD site. <br />5.02: Update on Alpine Drive Trail Connection between Nowthen Boulevard and <br />Krypton Street <br />City Engineer Westby acknowledged the attendance of residents Mark Martensen of 5803 Alpine <br />Drive NW and Jim Hirschman of 5859 Alpine Drive NW. <br />City Engineer Westby reviewed the staff report and indicated Anoka County moved the project <br />forward with no trail included. He stated at a prior meeting, there was some Council support to <br />create a trail connection between Nowthen Boulevard and Krypton Street. As a result, staff <br />explored options for cost - efficiently constructing a trail connection north of Alpine Drive while <br />minimizing impacts to the three residential properties. He explained this can be achieved by <br />constructing the trail directly behind the curb and narrowing the trail. Since this is a Municipal <br />State Aid (MSA) street, the City must follow its standards while constructing improvements <br />within the right -of -way. It was noted that based on MSA standards, a two -way multi -use <br />bituminous trail should be ten feet wide and a concrete sidewalk constructed to eight feet; <br />however, neither would appreciably reduce impacts to the three residential properties. <br />City Engineer Westby pointed out that if a trail connection north of Alpine Drive is not made at <br />this time, pedestrians and bicyclists can continue to use the bituminous trail on the south side of <br />Alpine Drive by crossing Alpine Drive at the existing mid -block pedestrian crossing. <br />City Engineer Westby displayed an aerial view of Mr. Hirschman's property, noting it shows a <br />realigned driveway and nine feet of right -of -way so a ten -foot trail would not fit unless <br />additional right -of -way is acquired. In addition, a retaining wall would be needed to <br />accommodate a sidewalk/trail. He pointed out the location of existing trees and those that would <br />be impacted. <br />Public Works Superintendent Riemer stated the existing trail /path is located to create better sight <br />lines and if constructed, would probably have to go towards the east. <br />Since an alternate route exists at this time, City Engineer Westby recommended waiting to <br />construct a trail connection north of Alpine Drive until such time that the residential properties to <br />the north are developed. In the mean time, staff can consider whether the trial can be moved to <br />the east and options for crosswalk signalization. <br />Chairperson Backous stated support for striping crosswalks in locations that have better <br />sightlines and signage. <br />Councilmember Kuzma stated support for the alternative of a crosswalk instead of having a path <br />right by their house. <br />Public Works Committee / April 15, 2014 <br />Page 4 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.