Laserfiche WebLink
SECTION 1 <br />INTRODUCTION <br />A. PURPOSE <br />The purpose for this study is to update the City's comprehensive sewer plans taking into <br />account current population and land use projections. Past sanitary sewer studies have been <br />completed for the City of Ramsey in the years 1971, 1974, 1978, 1989, and most recently in <br />1991. Prior to 1991 sanitary sewer planning was completed primarily to determine the <br />appropriate sizing of the metropolitan sewer facilities that ultimately serve the City of Ramsey. <br />The intent of this study is to incorporate the key components of past studies into one working <br />document for future sewer planning. <br />As with the 1991 Comprehensive Sewer Plan, this study does not propose the expansion <br />of sanitary sewers. The purpose of this report is to identify ultimate sewer flows based on current <br />land use planning and identify the approximate location, sizing, and capacity of the trunk <br />facilities needed to serve the potential growth. <br />B. REPORT ORGANIZATION <br />To adequately address the major areas that are evaluated, the report is organized in five <br />sections as shown below: <br />Section 1: Introduction. <br />Section 2: Reviews projected sanitary sewer flows based on anticipated population <br />trends. <br />Section 3: Evaluates the existing major sanitary sewer system components. <br />Section 4: Discusses the proposed sanitary sewer trunk system. <br />Section 5: Summarizes recommendations and provides an implementation plan. <br />City of Ramsey Page 1-1 <br />Comprehensive Sanitary Sewer Plan - 2004 Prepared by Bolton & Menk, Inc. <br />