Laserfiche WebLink
F. FINANCIAL IMPACT <br />The financial impacts associated with the construction of the total trunk sewer system <br />shown on Figure 3 have been estimated to be $27,090,010. Currently the City collects a sanitary <br />sewer trunk charge in the amount of $596 per connection. Based on the potential for 15,053 <br />units connected to the proposed interceptor sewer expansions, the City's current trunk charges <br />would generate $8,971,588. Therefore, for the City to cover the total estimated costs of the <br />proposed sanitary sewer system shown on Figure 3, it would be necessary to increase the trunk <br />sewer charge to $1,800. However, with the understanding that the City would only be <br />responsible for the cost of trunk sanitary lines with a size greater than 8-inchs, the trunk charge <br />would need to be increased to $1,100 to cover the estimated cost of $16,242,380. <br />City of Ramsey Page ES -5 <br />Comprehensive Sanitary Sewer Plan - 2004 Prepared by Bolton & Menk, Inc. <br />