|
Table 5.4 shows the financial impacts associated with the construction of the total trunk
<br />sewer system shown on Figure 3. An estimated length, size and construction cost is provided for
<br />each line.
<br />Table 5.4
<br />Trunk Sanitary Sewer System Improvements
<br />Sanitary Sewer Pipe
<br />Location
<br />Length
<br />Size
<br />(inchs)
<br />Cost per
<br />Foot
<br />Cost
<br />1
<br />MH 10 to MH 11
<br />1,460
<br />21
<br />$250
<br />$365,000.00
<br />2
<br />MH 58 to MH 5
<br />1,335
<br />12
<br />$110
<br />$146,850.00
<br />3
<br />MH 5 to MH 4
<br />4,025
<br />8
<br />$90
<br />$362,250.00
<br />4
<br />MH 10 to MH 58
<br />6,330
<br />18
<br />$230
<br />$1,455,900.00
<br />5
<br />MH 10 to MH 15
<br />8,175
<br />15
<br />$135
<br />$1,103,625.00
<br />6
<br />MH 54 to MH 13
<br />3,845
<br />8
<br />$90
<br />$346,050.00
<br />7
<br />MH 56 to MH 8
<br />2,475
<br />8
<br />$90
<br />$222,750.00
<br />8
<br />MH 56 to MH 14
<br />3,370
<br />8
<br />$90
<br />$303,300.00
<br />9
<br />MH 57 to MH 6
<br />3,290
<br />8
<br />$90
<br />$296,100.00
<br />10
<br />MLS 1 to MH 2
<br />6,420
<br />8
<br />$90
<br />$577,800.00
<br />11
<br />MLS 1 to MH 1
<br />4,845
<br />8
<br />$90
<br />$436,050.00
<br />12
<br />MLS 1 to MH 3
<br />6,170
<br />8
<br />$90
<br />$555,300.00
<br />13
<br />MH 11 to MLS 2
<br />2,815
<br />18
<br />$230
<br />$647,450.00
<br />14
<br />MLS 2 to MH 9
<br />9,200
<br />12
<br />$110
<br />$1,012,000.00
<br />15
<br />MLS 2 to MH 12
<br />4,485
<br />12
<br />$110
<br />$493,350.00
<br />16
<br />MH 16 to MH 17
<br />1,945
<br />10
<br />$100
<br />$194,500.00
<br />17
<br />MH 49 to MH 48
<br />1,480
<br />8
<br />$90
<br />$133,200.00
<br />18
<br />MH 50 to MH 65
<br />2,725
<br />30
<br />$323
<br />$880,175.00
<br />19
<br />MH 65 to MH 47
<br />6,030
<br />8
<br />$90
<br />$542,700.00
<br />20
<br />MH 65 to Split
<br />2,135
<br />30
<br />$323
<br />$689,605.00
<br />21
<br />MH 35 to MH 40
<br />5,770
<br />18
<br />$230
<br />$1,327,100.00
<br />22
<br />MH 45 to MH 46
<br />2,305
<br />10
<br />$100
<br />$230,500.00
<br />23
<br />MH 40 to MH 33
<br />805
<br />8
<br />$90
<br />$72,450.00
<br />24
<br />MH 40 to MH 41
<br />4,265
<br />18
<br />$230
<br />$980,950.00
<br />25
<br />MH 40 to MH 44
<br />5,880
<br />10
<br />$100
<br />$588,000.00
<br />26
<br />MH 41 to MH 43
<br />7,000
<br />10
<br />$100
<br />$700,000.00
<br />27
<br />MH 41 to RLS 3
<br />2,790
<br />8
<br />$90
<br />$251,100.00
<br />28
<br />RLS 3 to MH 21
<br />6,390
<br />8
<br />$90
<br />$575,100.00
<br />29
<br />MH 33 to MH 27
<br />4,320
<br />8
<br />$90
<br />$388,800.00
<br />30
<br />MH 35 to MH 39
<br />2,597
<br />8
<br />$90
<br />$233,730.00
<br />31
<br />MH 35 to MH 32
<br />3,330
<br />18
<br />$230
<br />$765,900.00
<br />32
<br />MH 34 to MH 42
<br />1,535
<br />8
<br />$90
<br />$138,150.00
<br />33
<br />MH 42 to MH 26
<br />2,210
<br />8
<br />$90
<br />$198,900.00
<br />34
<br />MH 32 to MH 38
<br />2,780
<br />8
<br />$90
<br />$250,200.00
<br />35
<br />MH 32 to MH 30
<br />2,495
<br />8
<br />$90
<br />$224,550.00
<br />City of Ramsey
<br />Comprehensive Sanitary Sewer Plan - 2004
<br />Page 5-4
<br />Prepared by Bolton & Menk, Inc.
<br />
|