Laserfiche WebLink
Table 5.4 shows the financial impacts associated with the construction of the total trunk <br />sewer system shown on Figure 3. An estimated length, size and construction cost is provided for <br />each line. <br />Table 5.4 <br />Trunk Sanitary Sewer System Improvements <br />Sanitary Sewer Pipe <br />Location <br />Length <br />Size <br />(inchs) <br />Cost per <br />Foot <br />Cost <br />1 <br />MH 10 to MH 11 <br />1,460 <br />21 <br />$250 <br />$365,000.00 <br />2 <br />MH 58 to MH 5 <br />1,335 <br />12 <br />$110 <br />$146,850.00 <br />3 <br />MH 5 to MH 4 <br />4,025 <br />8 <br />$90 <br />$362,250.00 <br />4 <br />MH 10 to MH 58 <br />6,330 <br />18 <br />$230 <br />$1,455,900.00 <br />5 <br />MH 10 to MH 15 <br />8,175 <br />15 <br />$135 <br />$1,103,625.00 <br />6 <br />MH 54 to MH 13 <br />3,845 <br />8 <br />$90 <br />$346,050.00 <br />7 <br />MH 56 to MH 8 <br />2,475 <br />8 <br />$90 <br />$222,750.00 <br />8 <br />MH 56 to MH 14 <br />3,370 <br />8 <br />$90 <br />$303,300.00 <br />9 <br />MH 57 to MH 6 <br />3,290 <br />8 <br />$90 <br />$296,100.00 <br />10 <br />MLS 1 to MH 2 <br />6,420 <br />8 <br />$90 <br />$577,800.00 <br />11 <br />MLS 1 to MH 1 <br />4,845 <br />8 <br />$90 <br />$436,050.00 <br />12 <br />MLS 1 to MH 3 <br />6,170 <br />8 <br />$90 <br />$555,300.00 <br />13 <br />MH 11 to MLS 2 <br />2,815 <br />18 <br />$230 <br />$647,450.00 <br />14 <br />MLS 2 to MH 9 <br />9,200 <br />12 <br />$110 <br />$1,012,000.00 <br />15 <br />MLS 2 to MH 12 <br />4,485 <br />12 <br />$110 <br />$493,350.00 <br />16 <br />MH 16 to MH 17 <br />1,945 <br />10 <br />$100 <br />$194,500.00 <br />17 <br />MH 49 to MH 48 <br />1,480 <br />8 <br />$90 <br />$133,200.00 <br />18 <br />MH 50 to MH 65 <br />2,725 <br />30 <br />$323 <br />$880,175.00 <br />19 <br />MH 65 to MH 47 <br />6,030 <br />8 <br />$90 <br />$542,700.00 <br />20 <br />MH 65 to Split <br />2,135 <br />30 <br />$323 <br />$689,605.00 <br />21 <br />MH 35 to MH 40 <br />5,770 <br />18 <br />$230 <br />$1,327,100.00 <br />22 <br />MH 45 to MH 46 <br />2,305 <br />10 <br />$100 <br />$230,500.00 <br />23 <br />MH 40 to MH 33 <br />805 <br />8 <br />$90 <br />$72,450.00 <br />24 <br />MH 40 to MH 41 <br />4,265 <br />18 <br />$230 <br />$980,950.00 <br />25 <br />MH 40 to MH 44 <br />5,880 <br />10 <br />$100 <br />$588,000.00 <br />26 <br />MH 41 to MH 43 <br />7,000 <br />10 <br />$100 <br />$700,000.00 <br />27 <br />MH 41 to RLS 3 <br />2,790 <br />8 <br />$90 <br />$251,100.00 <br />28 <br />RLS 3 to MH 21 <br />6,390 <br />8 <br />$90 <br />$575,100.00 <br />29 <br />MH 33 to MH 27 <br />4,320 <br />8 <br />$90 <br />$388,800.00 <br />30 <br />MH 35 to MH 39 <br />2,597 <br />8 <br />$90 <br />$233,730.00 <br />31 <br />MH 35 to MH 32 <br />3,330 <br />18 <br />$230 <br />$765,900.00 <br />32 <br />MH 34 to MH 42 <br />1,535 <br />8 <br />$90 <br />$138,150.00 <br />33 <br />MH 42 to MH 26 <br />2,210 <br />8 <br />$90 <br />$198,900.00 <br />34 <br />MH 32 to MH 38 <br />2,780 <br />8 <br />$90 <br />$250,200.00 <br />35 <br />MH 32 to MH 30 <br />2,495 <br />8 <br />$90 <br />$224,550.00 <br />City of Ramsey <br />Comprehensive Sanitary Sewer Plan - 2004 <br />Page 5-4 <br />Prepared by Bolton & Menk, Inc. <br />