Laserfiche WebLink
36 <br />MH 32 to MH 29 <br />3,565 <br />18 <br />$230 <br />$819,950.00 <br />37 <br />MH 60 to MH 37 <br />3,185 <br />8 <br />$90 <br />$286,650.00 <br />38 <br />MH 29 to MH 23 <br />1,860 <br />18 <br />$230 <br />$427,800.00 <br />39 <br />MH 23 to MH 24 <br />1,015 <br />15 <br />$135 <br />$137,025.00 <br />40 <br />MH 24 TO MH 66 <br />3,915 <br />10 <br />$100 <br />$391,500.00 <br />41 <br />MH 66 to MH 28 <br />1,520 <br />8 <br />$90 <br />$136,800.00 <br />42 <br />MH 25 to MH 53 <br />3,330 <br />8 <br />$90 <br />$299,700.00 <br />43 <br />MH 24 to MH 67 <br />2,535 <br />8 <br />$90 <br />$228,150.00 <br />44 <br />MH 67 to MH 20 <br />1,825 <br />8 <br />$90 <br />$164,250.00 <br />45 <br />RLS 1 to MH 19 <br />4,265 <br />8 <br />$90 <br />$383,850.00 <br />46 <br />MH 19 to MH 68 <br />2,510 <br />8 <br />$90 <br />$225,900.00 <br />47 <br />RLS 1 to MH 18 <br />3,775 <br />8 <br />$90 <br />$339,750.00 <br />48 <br />MH 23 to MH 22 <br />1,815 <br />8 <br />$90 <br />$163,350.00 <br />49 <br />MH 22 to RLS 4 <br />1,805 <br />FM <br />$150 <br />$270,750.00 <br />50 <br />RLS 4 to MH 61 <br />2,740 <br />8 <br />$90 <br />$246,600.00 <br />51 <br />Split to MH 61 <br />2,720 <br />8 <br />$90 <br />$244,800.00 <br />52 <br />MH 51 to MH 36 <br />4,710 <br />8 <br />$90 <br />$423,900.00 <br />53 <br />MH 51 to MH 52 <br />3,480 <br />8 <br />$90 <br />$313,200.00 <br />54 <br />MH 51 to MH 60 <br />2,520 <br />12 <br />$110 <br />$277,200.00 <br />55 <br />MH 60 to MH 59 <br />2,000 <br />8 <br />$90 <br />$180,000.00 <br />56 <br />MH 60 to RLS 2 <br />1,740 <br />FM <br />$150 <br />$261,000.00 <br />57 <br />RLS 2 to MH 63 <br />5,500 <br />8 <br />$90 <br />$495,000.00 <br />58 <br />Split to MH 64 <br />1,700 <br />8 <br />$90 <br />$153,000.00 <br />59 <br />MLS 1 to MH 5 <br />6,870 <br />FM <br />$150 <br />$1,030,500.00 <br />Lift Stations <br />6 Each <br />$250,000 <br />$1,500,000.00 <br />TOTALS <br />201,057 <br />$27,090,010.00 <br />Currently the City collects a sanitary sewer trunk charge in the amount of $596 per <br />connection. Based on the potential for 15,053 units connected to the proposed interceptor sewer <br />expansions, the City's current trunk charges would generate $8,971,588. Therefore, for the City <br />to cover the total estimated costs of the proposed sanitary sewer system shown on Figure 3, it <br />would be necessary to increase the trunk sewer charge to $1,800. However, with the <br />understanding that the City would only be responsible for the cost of trunk sanitary lines with a <br />size greater than 8-inchs, the trunk charge would need to be increased to $1,100 to cover the <br />estimated cost of $16,242,380. <br />City of Ramsey Page 5-5 <br />Comprehensive Sanitary Sewer Plan - 2004 Prepared by Bolton & Menk, Inc. <br />