My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/10/2014
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2014
>
Agenda - Planning Commission - 07/10/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:21:11 AM
Creation date
7/9/2014 12:24:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
07/10/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Street striping and signing <br />b. Seal coating <br />c. Street lights (not required) <br />d. Inspections <br />e. Installation of survey monumentation. <br />f Stage II cash deposit (not required) <br />(the "Stage II Improvements"). The PERMITTEE must complete the construction <br />of the Stage II Improvements within one (1) year after the date upon which the Plat <br />is recorded. <br />PERMITTEE must install the Stage II Improvements in accordance with the <br />Plans. Per City Code Section 117-615, the PERMITTEE shall provide the CITY <br />with a set of re -producible as -built plans in Computer Aided Drafting (CAD) format <br />upon completion of the Stage II Improvements and acceptance by the CITY. As <br />as -built plans are a required Stage II Improvement item per City Code Section 117- <br />615, the CITY will not release the required Stage I Improvement Financial <br />Guarantee noted in paragraph #6 above. Additionally, the PERMITTEE agrees to <br />provide to the CITY the plans in CAD format prior to the commencement of <br />construction of the Stage II Improvements. <br />13. Stage I and Stage II Improvements to Outlots. This paragraph intentionally deleted. <br />14. Financial Guaranty for Stage II Improvements. The CITY does not require a <br />financial guaranty to secure the PERMITTEE'S obligation to construct the Stage <br />II Improvements. <br />15. Street Cleaning and Clean Un. After the street surfacing that is a part of the Stage <br />I Improvements is installed, the PERMITTEE shall clear any soil, earth, or debris <br />from the streets. From time to time, the CITY may remove accumulations of soil, <br />earth, and debris from the streets resulting from the construction of the Stage I <br />Improvements. It shall be the PERMITTEE'S responsibility to pay the costs <br />associated with this necessary street cleaning. Invoices from the CITY to the <br />PERMITTEE for such costs shall be paid within fifteen (15) days of the date of <br />the invoice. <br />16. Payment of Development Fee's. The PERMITTEE must pay to the CITY the <br />fees described on Exhibit B which may include, but are not limited to, Park Land <br />Dedication Fees, Trail Development Fees, Sanitary Sewer Connection (Trunk) Fees <br />(not applicable), Water Connection (Trunk) Fees (not applicable), Sanitary Sewer <br />Lateral Fees (not applicable), Water Lateral Fees (not applicable), Storm <br />Management Fees, Street Light as well as Street Light Operation and Maintenance <br />Fees. <br />17. Requirements for Building and Occupancy Permits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.