Laserfiche WebLink
a. No building permit for any lot in the Plat shall be issued until the <br />PERMITTEE has: (a) installed a Class 5 driving surface to within 300 feet <br />of the structure; (b) provided the CITY Building Official with a Certificate <br />of Survey; c.) the financial guaranty described in Section 6 to the CITY; d.) <br />obtained all necessary permits from the Lower Rum River Watershed <br />Management Organization and the Anoka County Soil Conservation <br />District and has provided a copy of each such permit to the CITY; and <br />b. No occupancy permit for any lot in the Plat shall be issued until the <br />PERMITTEE has: (a) constructed vehicular access to the lot, including the <br />installation of at least one layer of bituminous surfacing; (b) constructed all <br />utilities and storm water facilities this Contract requires to serve the lot and <br />such utilities and storm water facilities are in place, and operational and the <br />CITY has accepted those utilities and storm water facilities; (c) for lots that <br />have a slope of less than 2%, provided the CITY with a certificate of <br />grading, prepared by a licensed (State of Minnesota) professional land <br />surveyor, certifying that the flattest grade on the lot is 1 % or greater; and <br />(d) installed and planted the sod and landscaping that are required as a part <br />of the Stage I Improvements. <br />18. PERMITTEE Defaults. If the PERMITTEE defaults in the performance of one <br />or more of the PERMITTEE' S obligations under this Contract, i) the CITY gives <br />the PERMITTEE thirty (30) days written notice of the default and ii) the <br />PERMITTEE fails to cure the default within said thirty (30), then the CITY may <br />pursue any and all remedies available at law or in equity including, but not limited <br />to the following: <br />4 <br />e <br />he CITY may, at its option, perform or engage one or more third parties <br />to perform the PERMITTEE'S obligations. If, in the reasonable judgment <br />of the CITY'S staff, the PERMITTEE' S default creates an immediate risk <br />to public health or safety, the CITY may perform or engage one or more <br />third parties to perform the work before the <br />CITY provides the notice described in the initial paragraph of this Section, <br />but the CITY must use commercially reasonable efforts to notify the <br />PERMITTEE as promptly as possible that the CITY is undertaking to <br />perform the PERMITTEE' S obligation or obligations. If the CITY <br />performs one or more obligations of the PERMITTEE, the PERMITTEE <br />must reimburse the CITY for any costs or expenses the CITY incurs, <br />including costs and expenses for CITY staff time, to perform the work <br />within 30 days after the CITY notifies the PERMITTEE, in writing, of the <br />costs and expenses the CITY incurred to perform the work. If the <br />PERMITTEE does not reimburse the CITY within said 30 day period, the <br />CITY may pursue any remedies available to the CITY either at law or in <br />equity or, in the alternative, the CITY may draw on the financial guaranty <br />the PERMITTEE has provided to the CITY pursuant to this Agreement to <br />