My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/15/2014
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2014
>
Agenda - Public Works Committee - 07/15/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:39:37 AM
Creation date
7/16/2014 9:10:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/15/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e es rian <br />Crossing Location: <br />City, State: <br />Reviewer(s): <br />Project Number: <br />eve! of Service (L S) at Uncontroiled Crossing Locations <br />Intersection an d-Block Crossings <br />Date: <br />Scenario: <br />Agency: <br />ID ft: <br />The following is the base information needed to complete the analysis. <br />If this is a one -stage crossing, use only Crossing 1. <br />If this is a two -stage crossing, each stage must be evaluated separately using Crossing 1 and Crossing 2. <br />Crossing 1: <br />Evaluation Inputs: <br />L = crosswalk length (ft) <br />Sp = average pedestrian walking speed (ft/s) <br />ts = pedestrian start-up and end clearance time (s) <br />V = vehicular hourly volume (veh/hr) <br />vp = pedestrian flow rate (ped/s) ; = 0* <br />= vehicular flow rate (veh/s) = V/3600 v = V/360 <br />Wc = crosswalk width (ft) 4 = 8.0 <br />N = number of through lanes crossed (Integer) N= INT(1112.11 <br />*no platooning observed <br />defaults: <br />Crossing 2: <br />Evaluation Inputs: <br />L = crosswalk length (ft) <br />Sp = average pedestrian walking speed (ft/s) <br />ts = pedestrian start-up and end clearance time (s) <br />V = vehicular hourly volume (veh/hr) <br />vp = pedestrian flow rate (ped/s) <br />v = vehicular flow rate (veh/s) = V/3600 <br />Wc = crosswalk width (ft) <br />N = number of through lanes crossed (Integer) <br />Crossing Treatment Yield Rate <br />My motorist yield rate (decimal) <br />Sp = <br />= <br />3.5 <br />3.0 <br />(only used for two -stage crossings) <br />defaults: Input Ta <br />3.5 <br />3.0 <br />vp = 0* <br />v = V/3600 <br />Wc = 8.0 <br />N = INT(L/11) <br />*no piatooning observed <br />Input Table: <br />Mt = <br />Entering data into the tables above will populate the evaluation tables in Microsoft Excel. <br />Results: <br />Developed by Bolton & rvIenk, <br />for the Local Road Research Board <br />Inputs and Results Page 2 of 5 <br />HCM Evaluation Worksheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.